{"title":"Fuzzy expert system for distribution system restoration and contingency operation","authors":"M.C. Mendiola, C. Chang, S. Elangovan","doi":"10.1109/EMPD.1995.500703","DOIUrl":null,"url":null,"abstract":"Over the years, computer technologies have been applied to operate the distribution system in the most reliable and efficient manner. In this work, a fuzzy expert system prototype had been developed to aid operators in distribution system restoration and contingency operation. The knowledge base, which contains the different strategies used in the project, had been adopted from the standard operating procedures of the Manila Electric Company (MERALCO). For restoration planning, the following factors were utilized in the evaluation of the solutions: percent load of the circuit and transformer and percent unbalance of the circuit. On the other hand, circuit overloads, transformer overloads and bus voltage correction had been addressed in contingency operation. Fuzzy logic membership functions were employed to compromise among conflicting evaluation factors. A Newton-Raphson load flow was integrated into the system to verify the soundness of the solutions in case of doubt. The prototype was tested on a portion of MERALCO's distribution network which consists of 12 distribution substations with 25 buses and 24 lines. Within its problem domain, the prototype performed as expected.","PeriodicalId":447674,"journal":{"name":"Proceedings 1995 International Conference on Energy Management and Power Delivery EMPD '95","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-11-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings 1995 International Conference on Energy Management and Power Delivery EMPD '95","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EMPD.1995.500703","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

Abstract

Over the years, computer technologies have been applied to operate the distribution system in the most reliable and efficient manner. In this work, a fuzzy expert system prototype had been developed to aid operators in distribution system restoration and contingency operation. The knowledge base, which contains the different strategies used in the project, had been adopted from the standard operating procedures of the Manila Electric Company (MERALCO). For restoration planning, the following factors were utilized in the evaluation of the solutions: percent load of the circuit and transformer and percent unbalance of the circuit. On the other hand, circuit overloads, transformer overloads and bus voltage correction had been addressed in contingency operation. Fuzzy logic membership functions were employed to compromise among conflicting evaluation factors. A Newton-Raphson load flow was integrated into the system to verify the soundness of the solutions in case of doubt. The prototype was tested on a portion of MERALCO's distribution network which consists of 12 distribution substations with 25 buses and 24 lines. Within its problem domain, the prototype performed as expected.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
配电系统恢复与应急运行模糊专家系统
多年来,计算机技术已被应用于以最可靠和有效的方式操作配电系统。本文开发了一个模糊专家系统原型,用于辅助配电系统的恢复和应急运行。该知识库包含项目中使用的不同策略,采用了马尼拉电力公司(MERALCO)的标准作业程序。对于恢复计划,在评估解决方案时使用了以下因素:电路和变压器的负载百分比和电路不平衡的百分比。另一方面,在应急运行中解决了电路过载、变压器过载和母线电压校正问题。采用模糊隶属函数在相互冲突的评价因素之间进行折衷。在系统中集成了牛顿-拉夫逊负荷流,以便在有疑问时验证解决方案的合理性。该原型在MERALCO配电网络的一部分进行了测试,该网络由12个配电变电站,25个总线和24条线路组成。在其问题域中,原型按预期执行。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Computer studies of high-voltage motor switching transients A study on the fault indentification of underground cable using neural networks The technical efficiency of developing country electricity systems A method for cost benefit analysis of distribution automation Statistical standards and pollution estimation of harmonics in a power system
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1