{"title":"Perbandingan Metode MPPT Incremental Conductance Incremental Resistance dan Hill Climbing dengan PSIM","authors":"D. Prakoso, Achmad Afandi, Miftahul Arrijal, Rizqy Abdurrahman, Novie Ayub Windarko","doi":"10.25105/jetri.v17i2.6076","DOIUrl":null,"url":null,"abstract":"Increasing energy requirements require us to create renewable energy that is e nvironmentally friendly such as utilizing sunlight. By using tracking techniques such as Maximum Power Point Tracking (MPPT) will produce maximum power so that the solar cell works efficiently. The MPPT method which is simulated in this PSIM software is Incremental Conductance, Incrementa l Resistance and Hill Climbing. By implanting the MPPT Incremental Conductane Method in the solar cell, a maximum power of 91,47 Watt will be generated with a time of 0.018 seconds, whereas if implanting the MPPT Incremental Resistance method in a solar cell will get a maximum power of 90.35 watt, a faster time than the previous method, and if implanting the MPPT Hill Climbing method to make the solar cell efficient it is necessary to add the KMPP value equal to 5 to get the maximum MPP value and not oscillate. So the Incremental Conductance method by adding a variable step size should be use to search the maximum power from all three methods . Kebutuhan energi yang semakin tinggi mengharuskan kita untuk menciptakan energi terbarukan yang ramah lingkungan seperti memanfaatkan cahaya matahari. Dengan menggunakan Teknik tracking seperti Maximum Power Point Tracking MPPT (MPPT) akan menghasilkan daya yang maksimal sehingga solar cell bekerja secara efesien. Metode MPPT yang disimulasikan di software PSIM ini adalah Incremental Conductance, Incremental Resistance dan Hill Climbing. Dengan menanamkan Metode MPPT Incremental Conductane pada solar cell maka akan dihasilkan daya maksimum sebesar 91, 47 Watt dengan waktu 0,018 detik, sedangkan jika menanamkan metode MPPT Incremental Resistance pada solar cell akan di dapatkan daya maksimum sebesar 9 0 ,3 5 watt dengan waktu yang lebih cepat dari metode sebelumnya, dan jika menanamkan metode MPPT Hill Climbing untuk mengefisienkan solar cell diharuskan menambahkan nilai KMPP sama dengan 5 untuk mendapatkan nilai MPP yang maksimal dan tidak berosilasi. Jadi jika untuk mencari daya yang sangat maksimal dari ketiga metode sebaiknya menggunakan metode Incremental Conductance dengan menambahkan variable step size.","PeriodicalId":114057,"journal":{"name":"Jetri : Jurnal Ilmiah Teknik Elektro","volume":"20 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-03-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jetri : Jurnal Ilmiah Teknik Elektro","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25105/jetri.v17i2.6076","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Increasing energy requirements require us to create renewable energy that is e nvironmentally friendly such as utilizing sunlight. By using tracking techniques such as Maximum Power Point Tracking (MPPT) will produce maximum power so that the solar cell works efficiently. The MPPT method which is simulated in this PSIM software is Incremental Conductance, Incrementa l Resistance and Hill Climbing. By implanting the MPPT Incremental Conductane Method in the solar cell, a maximum power of 91,47 Watt will be generated with a time of 0.018 seconds, whereas if implanting the MPPT Incremental Resistance method in a solar cell will get a maximum power of 90.35 watt, a faster time than the previous method, and if implanting the MPPT Hill Climbing method to make the solar cell efficient it is necessary to add the KMPP value equal to 5 to get the maximum MPP value and not oscillate. So the Incremental Conductance method by adding a variable step size should be use to search the maximum power from all three methods . Kebutuhan energi yang semakin tinggi mengharuskan kita untuk menciptakan energi terbarukan yang ramah lingkungan seperti memanfaatkan cahaya matahari. Dengan menggunakan Teknik tracking seperti Maximum Power Point Tracking MPPT (MPPT) akan menghasilkan daya yang maksimal sehingga solar cell bekerja secara efesien. Metode MPPT yang disimulasikan di software PSIM ini adalah Incremental Conductance, Incremental Resistance dan Hill Climbing. Dengan menanamkan Metode MPPT Incremental Conductane pada solar cell maka akan dihasilkan daya maksimum sebesar 91, 47 Watt dengan waktu 0,018 detik, sedangkan jika menanamkan metode MPPT Incremental Resistance pada solar cell akan di dapatkan daya maksimum sebesar 9 0 ,3 5 watt dengan waktu yang lebih cepat dari metode sebelumnya, dan jika menanamkan metode MPPT Hill Climbing untuk mengefisienkan solar cell diharuskan menambahkan nilai KMPP sama dengan 5 untuk mendapatkan nilai MPP yang maksimal dan tidak berosilasi. Jadi jika untuk mencari daya yang sangat maksimal dari ketiga metode sebaiknya menggunakan metode Incremental Conductance dengan menambahkan variable step size.
不断增长的能源需求要求我们创造环境友好的可再生能源,如利用阳光。通过使用跟踪技术,如最大功率点跟踪(MPPT)将产生最大功率,使太阳能电池有效地工作。在PSIM软件中模拟的MPPT方法是增量电导、增量电阻和爬坡。翻译通过植入MPPT增量Conductane方法在太阳能电池最大功率91、47个瓦特将生成时间为0.018秒,而如果翻译,植入MPPT阻力增量方法在太阳能电池将得到最大功率90.35瓦特,更快的时间比之前的方法,如果我的翻译,植入MPPT希尔攀登方法使太阳能电池效率有必要添加KMPP价值等于5的最大边际产量值,不摆动。因此,应使用增加可变步长的增量电导法从所有三种方法中搜索最大功率。Kebutuhan energi yang semakin tinggi mengharuskan kita untuk menciptakan energi terbarukan yang ramah lingkungan seperti manfaatkan cahaya matahari。最大功率点跟踪MPPT(最大功率点跟踪MPPT)。方法:MPPT阳模拟软件PSIM ini adalah增量电导,增量电阻丹爬坡。MPPT增量导电性太阳能电池maka akan dihasilkan daya maksimum sebesar 91,47瓦,dangan waktu 0,018 detik, dangan waktu daya maksimum sebesar 9,35瓦,dangan waktu yang lebih cepat dari meberumnya,攀爬,攀爬,攀爬,攀爬,攀爬,攀爬,攀爬,攀爬,攀爬,攀爬,攀爬,攀爬,攀爬,攀爬,攀爬Jadi jika untuk menari daya yang sangat maksimal dari ketiga方法sebaiknya menggunakan方法增量电导dengan menamakan变步长。