On-site construction productivity in Malaysian infrastructure projects

S. Durdyev, S. Ismail
{"title":"On-site construction productivity in Malaysian infrastructure projects","authors":"S. Durdyev, S. Ismail","doi":"10.1108/SS-12-2015-0058","DOIUrl":null,"url":null,"abstract":"Purpose \n \n \n \n \nThe purpose of this paper is to examine the factors constraining the on-site construction productivity and measures for its improvement in Malaysian construction industry. \n \n \n \n \nDesign/methodology/approach \n \n \n \n \nQuestionnaire survey is administered to 171 respondents, comprising government authorities and construction players. A total of 39 constraints are found to be significant factors in various risk levels. \n \n \n \n \nFindings \n \n \n \n \nConsequently, improvement measures are recommended addressing those constraints to on-site construction productivity. It is believed that the findings of this study will assist in achieving high level of on-site construction productivity by focusing and acting upon the most risky constraints, where construction players in Malaysia could be guided well in their efforts in a time-, cost- and quality-effective manner. \n \n \n \n \nOriginality/value \n \n \n \n \nIt is believed that the findings of this study will assist in achieving high level of on-site construction productivity by focusing and acting upon the most risky constraints, where construction players in Malaysia could be guided well in their efforts in a time-, cost- and quality-effective manner.","PeriodicalId":118605,"journal":{"name":"Structural Survey","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-08-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"61","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Structural Survey","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/SS-12-2015-0058","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 61

Abstract

Purpose The purpose of this paper is to examine the factors constraining the on-site construction productivity and measures for its improvement in Malaysian construction industry. Design/methodology/approach Questionnaire survey is administered to 171 respondents, comprising government authorities and construction players. A total of 39 constraints are found to be significant factors in various risk levels. Findings Consequently, improvement measures are recommended addressing those constraints to on-site construction productivity. It is believed that the findings of this study will assist in achieving high level of on-site construction productivity by focusing and acting upon the most risky constraints, where construction players in Malaysia could be guided well in their efforts in a time-, cost- and quality-effective manner. Originality/value It is believed that the findings of this study will assist in achieving high level of on-site construction productivity by focusing and acting upon the most risky constraints, where construction players in Malaysia could be guided well in their efforts in a time-, cost- and quality-effective manner.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
马来西亚基础设施项目的现场施工生产率
目的本文的目的是研究制约现场施工生产力的因素和措施,为其在马来西亚建筑业的改善。设计/方法/方法对171名受访者进行问卷调查,受访者包括政府当局和建筑公司。共有39个限制因素被发现是不同风险水平的重要因素。因此,建议采取改进措施,解决现场施工生产力的这些制约因素。据信,这项研究的结果将有助于实现高水平的现场施工生产力,通过关注和采取最危险的限制,马来西亚的建筑参与者可以在时间,成本和质量有效的方式下得到很好的指导。原创性/价值据信,本研究的结果将有助于通过关注和采取最具风险的限制来实现高水平的现场施工生产率,马来西亚的建筑参与者可以以时间、成本和质量有效的方式得到很好的指导。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Practical challenges of BIM education Rehabilitation of Osborne Dam outlets Thermal comfort analyses of naturally ventilated university classrooms The problem of clothes drying in new homes in the UK Research on the adoption barriers of the engineering construction standards in China
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1