{"title":"Balancing Optimization of Motor Production Line Based on Industrial Engineering Approach","authors":"Linping Ran, Yang Liu","doi":"10.4108/eai.24-2-2023.2330657","DOIUrl":null,"url":null,"abstract":": In order to solve the motor production line balance is low, low production efficiency, production capacity can not reach the expectations, the high rate of worker operation error. In this paper, the industrial engineering process analysis method, the ECRS principle, the \"5W1H\" and the implementation of 6S field management are adopted to improve the overall production operation of the production line and the operation content of some work units. The balance rate of the production line was increased from 71.72% to 78.23%. In terms of balance rate, the improved production line has a better effect than before, which makes the production line reach the scientific management level and provides a reference for the improvement of similar production line balance. It has important theoretical significance for the research results in manufacturing field, and has practical value for enterprises.","PeriodicalId":388726,"journal":{"name":"Proceedings of the 2nd International Conference on Engineering Management and Information Science, EMIS 2023, February 24-26, 2023, Chengdu, China","volume":"96 ","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2nd International Conference on Engineering Management and Information Science, EMIS 2023, February 24-26, 2023, Chengdu, China","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4108/eai.24-2-2023.2330657","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
: In order to solve the motor production line balance is low, low production efficiency, production capacity can not reach the expectations, the high rate of worker operation error. In this paper, the industrial engineering process analysis method, the ECRS principle, the "5W1H" and the implementation of 6S field management are adopted to improve the overall production operation of the production line and the operation content of some work units. The balance rate of the production line was increased from 71.72% to 78.23%. In terms of balance rate, the improved production line has a better effect than before, which makes the production line reach the scientific management level and provides a reference for the improvement of similar production line balance. It has important theoretical significance for the research results in manufacturing field, and has practical value for enterprises.