{"title":"Outsourcing non-preemptive operations to a third-party facility","authors":"Lianmin Zhang, Xiaoqiang Cai","doi":"10.1109/ICSSSM.2013.6602614","DOIUrl":null,"url":null,"abstract":"We consider the problem where a group of manufacturers outsource non-preemptive operations to a third-party, where non-preemptive operations means processing operations can not be interrupted when it starts, such as mould making, blast furnace iron making. The manufacturers book time windows announced by third-party with prices and schedule operations in the booked time window. The cost for each manufacturer consists of booking and work-in-progress costs. We address some optimal decision for manufacturers to book time windows and schedule their jobs in the booked time windows so as to minimize their individual cost.","PeriodicalId":354195,"journal":{"name":"2013 10th International Conference on Service Systems and Service Management","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-07-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 10th International Conference on Service Systems and Service Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSSSM.2013.6602614","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
We consider the problem where a group of manufacturers outsource non-preemptive operations to a third-party, where non-preemptive operations means processing operations can not be interrupted when it starts, such as mould making, blast furnace iron making. The manufacturers book time windows announced by third-party with prices and schedule operations in the booked time window. The cost for each manufacturer consists of booking and work-in-progress costs. We address some optimal decision for manufacturers to book time windows and schedule their jobs in the booked time windows so as to minimize their individual cost.