Risk analysis and rescue operation for machine roomless lift: A case study

Choo Yong Lee, Chin Huat Lim
{"title":"Risk analysis and rescue operation for machine roomless lift: A case study","authors":"Choo Yong Lee, Chin Huat Lim","doi":"10.1109/IEEM.2014.7058841","DOIUrl":null,"url":null,"abstract":"We analyze potential risks of machine roomless lift at system design level by evaluating risk rate (R) which is a combination of occurrence (O) and severity of specific risk (S). Risks during installation, testing and commissioning of lift, maintenance and rescue operation which might endanger life of person are considered. Our study includes identify risk, determine risk rate and formulate control measure to reduce risk rate to acceptable value by applying extensive field experience and sound engineering know how in lift system. From risk analysis outcome, we are motivated to develop comprehensive rescue operation flow which would be useful guide for generic MRL system design as there are no much literatures in this topic.","PeriodicalId":318405,"journal":{"name":"2014 IEEE International Conference on Industrial Engineering and Engineering Management","volume":"53 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE International Conference on Industrial Engineering and Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM.2014.7058841","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

We analyze potential risks of machine roomless lift at system design level by evaluating risk rate (R) which is a combination of occurrence (O) and severity of specific risk (S). Risks during installation, testing and commissioning of lift, maintenance and rescue operation which might endanger life of person are considered. Our study includes identify risk, determine risk rate and formulate control measure to reduce risk rate to acceptable value by applying extensive field experience and sound engineering know how in lift system. From risk analysis outcome, we are motivated to develop comprehensive rescue operation flow which would be useful guide for generic MRL system design as there are no much literatures in this topic.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
无机房电梯的风险分析与救援行动:个案研究
通过评估风险率(R),即风险发生率(O)和特定风险严重程度(S)的组合,分析了无机房电梯在系统设计层面的潜在风险。考虑了电梯安装、测试、调试、维修和救援操作过程中可能危及人员生命的风险。我们的研究包括识别风险,确定风险率,并制定控制措施,通过应用丰富的现场经验和完善的工程技术,将风险率降低到可接受的范围内。从风险分析的结果来看,由于相关文献较少,我们有动力制定综合的救援操作流程,这将有助于通用MRL系统的设计。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Supplier selection activities in the service sector: A case study in Nigeria Modelling financial flow of the supply chain Adoption of near field communication for mobile payment: Evidence from Macau The optimal ordering quantity with uncertain food's safety environment Standardization programs in the industrial plant business: Best practices and lessons learned
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1