{"title":"Optimisation of Capacitated Planned Preventive Maintenance in Multiple Production Lines Using Optimisation-in-the-Loop Simulation","authors":"Muhammad Ridwan Andi Purnomo, Dzuraidah Abdul Wahab, Salvinder Singh","doi":"10.30880/ijie.2023.15.05.028","DOIUrl":null,"url":null,"abstract":"In a mass customisation manufacturing system, the production schedule is tailored to the customer's specifications. However, the production system must be accompanied by an effective maintenance program to ensure that the production lines operate as intended. The purpose of this study is to optimise planned preventive maintenance across multiple production lines. An optimised Weibull distribution is proposed to model the machine's Mean Time Between Failures (MTBF), and the total expected maintenance cost is calculated using this distribution, taking into account the probability of the machines remaining operational and failing. Because the optimised Weibull distribution is a continuous distribution, in order to simulate the continuous time domain, it will be divided into several sub-systems and optimised using Bayesian optimisation during simulation. The maintenance scheduling is carried out by considering available time capacity after production scheduling was arranged. The study's findings indicate that the proposed method successfully optimised the planned maintenance schedule without interfering production activity with total cost for the proposed maintenance planning as low as IDR 50.017,75/maintenance unit time.","PeriodicalId":14189,"journal":{"name":"International Journal of Integrated Engineering","volume":"18 1","pages":"0"},"PeriodicalIF":0.4000,"publicationDate":"2023-10-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Integrated Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30880/ijie.2023.15.05.028","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

Abstract

In a mass customisation manufacturing system, the production schedule is tailored to the customer's specifications. However, the production system must be accompanied by an effective maintenance program to ensure that the production lines operate as intended. The purpose of this study is to optimise planned preventive maintenance across multiple production lines. An optimised Weibull distribution is proposed to model the machine's Mean Time Between Failures (MTBF), and the total expected maintenance cost is calculated using this distribution, taking into account the probability of the machines remaining operational and failing. Because the optimised Weibull distribution is a continuous distribution, in order to simulate the continuous time domain, it will be divided into several sub-systems and optimised using Bayesian optimisation during simulation. The maintenance scheduling is carried out by considering available time capacity after production scheduling was arranged. The study's findings indicate that the proposed method successfully optimised the planned maintenance schedule without interfering production activity with total cost for the proposed maintenance planning as low as IDR 50.017,75/maintenance unit time.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于环内优化仿真的多生产线有能力计划预防性维修优化
在大规模定制制造系统中,生产计划是根据客户的规格定制的。然而,生产系统必须伴随着有效的维护程序,以确保生产线按预期运行。本研究的目的是优化多生产线的计划预防性维修。提出了一个优化的威布尔分布来模拟机器的平均故障间隔时间(MTBF),并使用该分布计算总预期维护成本,同时考虑到机器保持运行和故障的概率。由于优化后的威布尔分布是一个连续分布,为了模拟连续时域,将其划分为几个子系统,在模拟时使用贝叶斯优化进行优化。在安排好生产调度后,考虑可用时间容量进行维修调度。研究结果表明,该方法在不干扰生产活动的情况下成功地优化了计划维修计划,维修计划的总成本低至50.017.75印尼盾/维修单位时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
International Journal of Integrated Engineering
International Journal of Integrated Engineering ENGINEERING, MULTIDISCIPLINARY-
CiteScore
1.40
自引率
0.00%
发文量
57
期刊介绍: The International Journal of Integrated Engineering (IJIE) is a single blind peer reviewed journal which publishes 3 times a year since 2009. The journal is dedicated to various issues focusing on 3 different fields which are:- Civil and Environmental Engineering. Original contributions for civil and environmental engineering related practices will be publishing under this category and as the nucleus of the journal contents. The journal publishes a wide range of research and application papers which describe laboratory and numerical investigations or report on full scale projects. Electrical and Electronic Engineering. It stands as a international medium for the publication of original papers concerned with the electrical and electronic engineering. The journal aims to present to the international community important results of work in this field, whether in the form of research, development, application or design. Mechanical, Materials and Manufacturing Engineering. It is a platform for the publication and dissemination of original work which contributes to the understanding of the main disciplines underpinning the mechanical, materials and manufacturing engineering. Original contributions giving insight into engineering practices related to mechanical, materials and manufacturing engineering form the core of the journal contents.
期刊最新文献
Assisted Car Platooning and Congestion Control at Road Intersections Design and Characterization of a Non-Linear Variable Inerter in Vehicle Suspension System Wireless Hybrid Vehicle Three-Phase Motor Diagnosis Using Z-Freq Due to Unbalance Fault Evaluation of End-of-Life Vehicle Recycling in India: A Techno-Socio-Economic Analysis Influence of Rolling and Ageing On Mechanical Properties of AA2195 Based Metal Matrix Composites
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1