Assessment of the ventilation network condition within the Le-3 ore body at the Juliet deposit

V.V. Arno, A. Volin, L.Yu. Kalinina, I. Garifulina, N. Lomakina, E. A. Elnikova
{"title":"Assessment of the ventilation network condition within the Le-3 ore body at the Juliet deposit","authors":"V.V. Arno, A. Volin, L.Yu. Kalinina, I. Garifulina, N. Lomakina, E. A. Elnikova","doi":"10.30686/1609-9192-2023-6-143-147","DOIUrl":null,"url":null,"abstract":"Effective, high-quality and steady ventilation of mine workings is one of the main factors that determine safe working conditions in an underground mine. The Juliet deposit is characterized with an irregular shape and varying dips and strikes. In some cases, it consists of isolated and mutually remote deposits with different mining and geological characteristics. These features of the deposit dictate the use of complex schemes for the development and mining of the deep-lying layers, which results in formation of a very extensive and branched network of underground workings. The specific features in the development of the Juliet deposit include the fact that a large number of mining blocks are in operation at the same time, and extraction of these block can be carried out using different mining systems. Intensive removal of dust and gases can be ensured only when a sufficiently large amount of air is supplied to the mine and the individual working faces. In order to overcome the overall air drag in the mine, it is necessary to use high-performance and high-pressure fans that would consume enormous power.","PeriodicalId":506182,"journal":{"name":"Mining Industry Journal (Gornay Promishlennost)","volume":"25 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-12-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mining Industry Journal (Gornay Promishlennost)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30686/1609-9192-2023-6-143-147","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Effective, high-quality and steady ventilation of mine workings is one of the main factors that determine safe working conditions in an underground mine. The Juliet deposit is characterized with an irregular shape and varying dips and strikes. In some cases, it consists of isolated and mutually remote deposits with different mining and geological characteristics. These features of the deposit dictate the use of complex schemes for the development and mining of the deep-lying layers, which results in formation of a very extensive and branched network of underground workings. The specific features in the development of the Juliet deposit include the fact that a large number of mining blocks are in operation at the same time, and extraction of these block can be carried out using different mining systems. Intensive removal of dust and gases can be ensured only when a sufficiently large amount of air is supplied to the mine and the individual working faces. In order to overcome the overall air drag in the mine, it is necessary to use high-performance and high-pressure fans that would consume enormous power.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
朱丽叶矿床 Le-3 矿体通风网络状况评估
有效、高质量和稳定的矿井通风是决定地下矿井安全工作条件的主要因素之一。朱丽叶矿床的特点是形状不规则,倾角和走向各不相同。在某些情况下,它由相互孤立、相互远离的矿床组成,这些矿床具有不同的采矿和地质特征。该矿床的这些特点决定了必须采用复杂的方案来开发和开采深部地层,从而形成一个非常广泛和分支的地下开采网络。朱丽叶矿床开发的具体特点包括:大量矿块同时开采,这些矿块的开采可采用不同的开采系统。只有向矿井和各个工作面提供足够多的空气,才能确保密集地清除粉尘和气体。为了克服矿井中的总体空气阻力,必须使用耗电量巨大的高性能高压风机。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A comparative strength analysis of diamond cable segments for stone cutting machines Prospects for increasing the mineral base of the non-ferrous metallurgy Production and utilization of magnesium oxide in the Russian Federation Perspectives of using satellite databases of greenhouse gas emissions in monitoring of mining facilities Issues related to implementation of big data analytical systems and other digitalization achievements to improve the business efficiency of mining companies
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1