IF 1.9 Q3 MANAGEMENT Infrastructure Asset Management Pub Date : 2023-11-20 DOI:10.1680/jinam.23.00038
Hamed Mehranfar, B. Adey, Saviz Moghtadernejad, Steven Chuo
{"title":"Automated early estimation of bridge interventions, possession windows and costs","authors":"Hamed Mehranfar, B. Adey, Saviz Moghtadernejad, Steven Chuo","doi":"10.1680/jinam.23.00038","DOIUrl":null,"url":null,"abstract":"Bridge managers need to generate a complete overview of required interventions, possession windows and the likely costs 10-20 years ahead of execution. These, even if approximate, help ensure stable train schedules. With the increasing amount of available data and the increasing desire to exploit digitalisation to improve decision-making, bridge managers are perfectly poised to make or improve these estimates by moving on from current qualitative methods. This paper proposes a way in the current climate to use digitalisation and existing data to generate approximate overviews of required interventions 10-20 years ahead of time, including estimates of component-level bridge interventions, possession windows, likely costs, and the increases in failure risks if interventions are postponed. A demonstration is done on 41 bridges of a 25 km railway network in Switzerland. It is argued that the algorithm generates a more complete and consistent overview of component-level interventions, possession windows, and costs compared to the current qualitative methods. Additionally, the algorithm generates a solid basis for the initiation of detailed investigations of the bridges by engineering offices, i.e., the investigations that result in the information required for scheduling an intervention, as well as estimating the type of intervention and track possession are required.","PeriodicalId":43387,"journal":{"name":"Infrastructure Asset Management","volume":"51 4","pages":""},"PeriodicalIF":1.9000,"publicationDate":"2023-11-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Infrastructure Asset Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jinam.23.00038","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 0

Abstract

Bridge managers need to generate a complete overview of required interventions, possession windows and the likely costs 10-20 years ahead of execution. These, even if approximate, help ensure stable train schedules. With the increasing amount of available data and the increasing desire to exploit digitalisation to improve decision-making, bridge managers are perfectly poised to make or improve these estimates by moving on from current qualitative methods. This paper proposes a way in the current climate to use digitalisation and existing data to generate approximate overviews of required interventions 10-20 years ahead of time, including estimates of component-level bridge interventions, possession windows, likely costs, and the increases in failure risks if interventions are postponed. A demonstration is done on 41 bridges of a 25 km railway network in Switzerland. It is argued that the algorithm generates a more complete and consistent overview of component-level interventions, possession windows, and costs compared to the current qualitative methods. Additionally, the algorithm generates a solid basis for the initiation of detailed investigations of the bridges by engineering offices, i.e., the investigations that result in the information required for scheduling an intervention, as well as estimating the type of intervention and track possession are required.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
自动对桥梁干预措施、占用窗口和成本进行早期估算
桥梁管理者需要提前 10-20 年全面了解所需的干预措施、占用窗口和可能的成本。这些即使是近似值,也有助于确保稳定的列车时刻表。随着可用数据量的不断增加,以及人们越来越希望利用数字化来改进决策,桥梁管理者完全可以通过改变现有的定性方法来进行或改进这些估算。本文提出了一种在当前环境下利用数字化和现有数据提前 10-20 年生成所需干预措施近似概览的方法,包括对桥梁构件级干预措施、占有窗口、可能的成本以及推迟干预措施会增加的故障风险的估算。在瑞士 25 公里铁路网的 41 座桥梁上进行了演示。结果表明,与目前的定性方法相比,该算法能更完整、更一致地概括部件级干预措施、占用窗口和成本。此外,该算法还为工程部门开始对桥梁进行详细调查奠定了坚实的基础,即通过调查获得制定干预计划所需的信息,以及估计所需的干预类型和轨道占用情况。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
2.70
自引率
14.30%
发文量
18
期刊最新文献
Exploration of the impact of junction characteristics on pedestrian red light violation Viability rubric of FRP composites for civil infrastructure applications Automated early estimation of bridge interventions, possession windows and costs Multi-objective optimization of building planning energy saving based on genetic algorithm Evaluating the impact of flexible offices in coping with the uncertainty on future demand
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1