{"title":"Recommendations on operation and improvement in the quality of in-pit road maintenance at the Olympiadinsky and Blagodatny mining and processing plants","authors":"A. G. Zhuravlev, V. A. Cherepanov, V.A. Karpov, A.Yu. Nevezhin","doi":"10.30686/1609-9192-2023-5-88-95","DOIUrl":null,"url":null,"abstract":"A systematic increase in the volume of the rock mass extracted at the pits of the Olympiadinsky and Blagodatny ore mining and processing plants significantly raises the requirements for the smooth operation of the mining vehicles and optimization of the transportation cost due to a steady and significant increase in annual production and the average haulage distances. Along with a significant design depth (765 m for the Vostochny quarry, the Olympiadinsky ore mining and processing plant), mining is carried out within a rather narrow ring-shaped working area, which leads to high concentration of mining activities and makes it difficult to manage the operation of all types of equipment, including the process vehicles, for which the project justifies the slope angle of the pit roads to be up to 100‰, which would ensure the reduction of pit wall spreading and the decrease in the stripping volumes. The above features create specific conditions for road maintenance and require justification of measures to enhance these activities, which is one of the ways to reduce the cost of the rock mass haulage (with account of a comprehensive analysis of the current conditions and generalization of the experimental work results). Based on the results of measurements and observations of the road condition during the year, an analysis of the actual condition of the roads at the Olympiadinsky and Blagodatny ore mining and processing plants was carried out and measures to improve them were proposed. Based on the analysis of the specific features in formation and operation of the roads at the quarries of the Olympiadinsky and Blagodatny ore mining and processing plants, the article systematizes the recommendations on the in-pit road construction and maintenance. The article describes a methodology of optimizing the design (thickness) of the road topping. The economic effect of improving the condition of the in-pit roads in accordance with the increased haulage volumes has been determined.","PeriodicalId":506182,"journal":{"name":"Mining Industry Journal (Gornay Promishlennost)","volume":"42 12","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-11-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mining Industry Journal (Gornay Promishlennost)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30686/1609-9192-2023-5-88-95","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

A systematic increase in the volume of the rock mass extracted at the pits of the Olympiadinsky and Blagodatny ore mining and processing plants significantly raises the requirements for the smooth operation of the mining vehicles and optimization of the transportation cost due to a steady and significant increase in annual production and the average haulage distances. Along with a significant design depth (765 m for the Vostochny quarry, the Olympiadinsky ore mining and processing plant), mining is carried out within a rather narrow ring-shaped working area, which leads to high concentration of mining activities and makes it difficult to manage the operation of all types of equipment, including the process vehicles, for which the project justifies the slope angle of the pit roads to be up to 100‰, which would ensure the reduction of pit wall spreading and the decrease in the stripping volumes. The above features create specific conditions for road maintenance and require justification of measures to enhance these activities, which is one of the ways to reduce the cost of the rock mass haulage (with account of a comprehensive analysis of the current conditions and generalization of the experimental work results). Based on the results of measurements and observations of the road condition during the year, an analysis of the actual condition of the roads at the Olympiadinsky and Blagodatny ore mining and processing plants was carried out and measures to improve them were proposed. Based on the analysis of the specific features in formation and operation of the roads at the quarries of the Olympiadinsky and Blagodatny ore mining and processing plants, the article systematizes the recommendations on the in-pit road construction and maintenance. The article describes a methodology of optimizing the design (thickness) of the road topping. The economic effect of improving the condition of the in-pit roads in accordance with the increased haulage volumes has been determined.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
关于奥林匹亚金斯基和布拉戈达特尼采矿选矿厂运营和提高矿坑内道路维护质量的建议
奥林匹亚金斯基和布拉戈达特尼矿石开采和加工厂矿坑开采的岩体量不断增加,由于年产量和平均运输距离持续大幅增加,对采矿车辆的平稳运行和运输成本优化提出了更高要求。除了设计深度大(沃斯托奇采石场、奥林匹亚金斯基矿石开采和加工厂的设计深度为 765 米)之外,采矿还在一个相当狭窄的环形工作区内进行,这导致采矿活动高度集中,难以管理各类设备(包括加工车辆)的运行,为此,该项目将矿坑道路的坡度角控制在 100‰以内,这将确保减少矿坑壁的扩张和剥离量的减少。上述特点为道路维护创造了特殊条件,需要采取措施加强这些活动,这也是降低岩体运 输成本的方法之一(考虑到对当前条件的综合分析和对实验结果的归纳)。根据当年对道路状况的测量和观察结果,对奥林匹亚金斯基和布拉戈达特尼矿石开采和加工厂的道路实际状况进行了分析,并提出了改进措施。根据对奥林匹亚金斯基和布拉戈达特尼矿石开采和加工厂采石场道路形成和运行特点的分析,文章系统地提出了关于矿坑内道路建设和维护的建议。文章介绍了优化路面顶层设计(厚度)的方法。根据运输量的增加,确定了改善坑内道路状况的经济效果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A comparative strength analysis of diamond cable segments for stone cutting machines Prospects for increasing the mineral base of the non-ferrous metallurgy Production and utilization of magnesium oxide in the Russian Federation Perspectives of using satellite databases of greenhouse gas emissions in monitoring of mining facilities Issues related to implementation of big data analytical systems and other digitalization achievements to improve the business efficiency of mining companies
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1