METODE PELAKSANAAN PEKERJAAN LANTAI PARTISI DI SALURAN INDUK CIPELANG PADA RENTANG IRRIGATION MODERNIZATION PROJECT

Yoyo Sunarya, Eka Juliar
{"title":"METODE PELAKSANAAN PEKERJAAN LANTAI PARTISI DI SALURAN INDUK CIPELANG PADA RENTANG IRRIGATION MODERNIZATION PROJECT","authors":"Yoyo Sunarya, Eka Juliar","doi":"10.31949/stima.v7i0.972","DOIUrl":null,"url":null,"abstract":"The Range Irrigation Area is a national strategic project located in the lowlands of the lower reaches of the Cimanuk River in the Northeastern part of West Java Province. The modernization of Span Irrigation is carried out because the age of the irrigation system is decaded old, causing reduced water service performance due to narrowing of the enbankments, sediment and groundwater infiltration in the Cipelang Main Canal. The use of material for contruction that is on the ground surface of this irrigation canal is by using a concrete floor (partition floor) which aims to reduce the water loss factor in the Cipelang Main Canal. The techninal work for making concrete floors is carried out in a Cast In Site manner, meaning the type of concrete casting work on site or directly in the workplace. The Partition Concrete Floor work in the Cipelang main canal aims to reduce the water loss factor so that it can increase the efficiency of irrigation water use. Partition Concrete Floor use K-175 concrete quality with cast in site technical work, not using precast concrete. There are 9 (nine) stages regarding the Partition Floor Work Implementation Method, namely starting from the work of Preparation, Kisdam, Dewatering, Excavation + Furnishing and Installation Filter, Lean Concrete Floor, Wiremesh + Install Beam and Footing Reinsforcement, Casting In Site, Finishing Top Floor, Concrete Curing.","PeriodicalId":161203,"journal":{"name":"SEMINAR TEKNOLOGI MAJALENGKA (STIMA)","volume":"160 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-11-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"SEMINAR TEKNOLOGI MAJALENGKA (STIMA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31949/stima.v7i0.972","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Range Irrigation Area is a national strategic project located in the lowlands of the lower reaches of the Cimanuk River in the Northeastern part of West Java Province. The modernization of Span Irrigation is carried out because the age of the irrigation system is decaded old, causing reduced water service performance due to narrowing of the enbankments, sediment and groundwater infiltration in the Cipelang Main Canal. The use of material for contruction that is on the ground surface of this irrigation canal is by using a concrete floor (partition floor) which aims to reduce the water loss factor in the Cipelang Main Canal. The techninal work for making concrete floors is carried out in a Cast In Site manner, meaning the type of concrete casting work on site or directly in the workplace. The Partition Concrete Floor work in the Cipelang main canal aims to reduce the water loss factor so that it can increase the efficiency of irrigation water use. Partition Concrete Floor use K-175 concrete quality with cast in site technical work, not using precast concrete. There are 9 (nine) stages regarding the Partition Floor Work Implementation Method, namely starting from the work of Preparation, Kisdam, Dewatering, Excavation + Furnishing and Installation Filter, Lean Concrete Floor, Wiremesh + Install Beam and Footing Reinsforcement, Casting In Site, Finishing Top Floor, Concrete Curing.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
灌溉现代化项目区 Cipelang 干渠分隔层工程的实施方法
斯潘灌溉区(Range Irrigation Area)是一个国家战略项目,位于西爪哇省东北部西马努克河(Cimanuk River)下游的低洼地带。对斯潘灌溉区进行现代化改造的原因是,灌溉系统已使用了几十年,由于堤岸狭窄、泥沙和地下水渗入 Cipelang 总渠,导致供水服务性能下降。该灌溉渠地表的建筑材料使用混凝土地面(隔墙地面),目的是减少 Cipelang 总渠的水量损失。制作混凝土地面的技术工作是以现场浇注的方式进行的,即在现场或直接在工作场所进行混凝土浇注工作。西贝朗干渠的混凝土隔墙地板工程旨在减少水的流失,从而提高灌溉水的使用效率。隔墙混凝土地板使用 K-175 混凝土质量,采用现场浇筑技术,不使用预制混凝土。隔墙混凝土地面施工方法分为 9 个阶段,即从准备、基斯潭、脱水、挖掘+装修和安装过滤器、精益混凝土地面、钢丝网+安装梁和地脚加固、现场浇注、顶层地面收尾、混凝土养护等工作开始。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
PEMBUATAN PART RING RAINFORCEMENT MENGGUNAKAN MESIN PRESS STAMPING CHIN FONG 110 SISTEM INFORMASI PENGOLAHAN DATA ABSENSI PEGAWAI KANTOR BALAI KB KECAMATAN PANYINGKIRAN BERBASIS WEB DAN ANDROID Penentuan Waktu Baku dengan Metode Stopwacth Time Study Studi Kasus Depot Air Syam STUDI KELAYAKAN SIFAT – SIFAT AGREGAT UNTUK CAMPURAN BETON TERHADAP NILAI KUAT TEKAN BETON DI PROYEK REKONSTRUKSI ATAU PENINGKATAN KAPASITAS STRUKTUR JALAN KADUT – SP. GUNUNGLARANG TONGGOH KEC. BANTARUJEG KAB. MAJALENGKA Metode Pelaksanaan Pekerjaan Dinding Penahan Tanah (Retaining Wall) Pada Proyek Preservasi Jalan Cirebon - Palimanan - Sumedang (Studi Kasus : Longsoran Km.68+500 Kabupaten Sumedang)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1