{"title":"Construction mode optimal selection method for intelligent sensing system in zero‐carbon parks","authors":"Mengzeng Cheng, Wei Niu, Jingwei Hu, Zongyuan Wang, Jing Chen, Chao Lin","doi":"10.1049/tje2.12326","DOIUrl":null,"url":null,"abstract":"The intelligent sensing system is the digital basis for zero‐carbon park operation. Due to the immaturity of its cost‐benefit accounting method and the lack of a special construction mode evaluation system, there is blindness in its investment and construction process. In order to select the suitable construction mode for the intelligent sensing system scientifically and effectively, this paper first establishes the architecture of the intelligent sensing system, and determines a cost‐benefit accounting method of the intelligent sensing system. Then, this paper establishes a construction mode evaluation index system including techno‐economic indicators, and proposes a fuzzy comprehensive evaluation method combing analytic hierarchy process and the decision‐making trial and evaluation laboratory to select the optimal construction mode. The numerical analyses show that the public‐private‐partnership mode of the intelligent sensing system has achieved ideal implementation results.","PeriodicalId":22858,"journal":{"name":"The Journal of Engineering","volume":"20 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Journal of Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1049/tje2.12326","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The intelligent sensing system is the digital basis for zero‐carbon park operation. Due to the immaturity of its cost‐benefit accounting method and the lack of a special construction mode evaluation system, there is blindness in its investment and construction process. In order to select the suitable construction mode for the intelligent sensing system scientifically and effectively, this paper first establishes the architecture of the intelligent sensing system, and determines a cost‐benefit accounting method of the intelligent sensing system. Then, this paper establishes a construction mode evaluation index system including techno‐economic indicators, and proposes a fuzzy comprehensive evaluation method combing analytic hierarchy process and the decision‐making trial and evaluation laboratory to select the optimal construction mode. The numerical analyses show that the public‐private‐partnership mode of the intelligent sensing system has achieved ideal implementation results.