ANALYSIS OF TECHNICAL AND FINANCIAL FEASIBILITY STUDY OF PROJECT DEVELOPMENT RENOVATION OF KAPUAS INDAH MARKET PROJECT AND PUBLIC SERVICE MALL

Sasqia Nur Saffanah, Lusiana Lusiana, Syahrudin Syahrudin
{"title":"ANALYSIS OF TECHNICAL AND FINANCIAL FEASIBILITY STUDY OF PROJECT DEVELOPMENT RENOVATION OF KAPUAS INDAH MARKET PROJECT AND PUBLIC SERVICE MALL","authors":"Sasqia Nur Saffanah, Lusiana Lusiana, Syahrudin Syahrudin","doi":"10.26418/jts.v23i4.67489","DOIUrl":null,"url":null,"abstract":"Each district or city is required to establish a Public Service Mall for services to the community, therefore the Government wants to make the Kapuas Indah Market building multifunctional which has been neglected for a long time by having a Public Service Mall on the 3rd floor of the Kapuas Indah Market with a total building area of ± 7,380m2. The construction of this renovation will certainly have various impacts so it is necessary to carry out a feasibility study in terms of technical and financial aspects.Analysis of the technical aspects carried out is based on the Basic Building Coefficient (KDB) of 78.79%, Building Floor Coefficient (KLB) of 2.36, Green Area Coefficient (KDH) of 21.20%, Parking Space Requirement of 581SRP, and Accessibility The locations reviewed are in accordance with applicable regulations and guidelines that the technical aspects of the renovation of the construction of the Kapuas Indah Market and Public Service Mall can be said to be feasible or have met the requirements in the construction of a project. While the results of the financial feasibility analysis show that the renovation project for the construction of the Kapuas Indah market and the Public Service Mall is feasible (profitable) because the results obtained using the Net Present Value (NPV) obtained a value of Rp. 10,223,725,624 > 1, the value of the Benefit Cost Ratio (BCR) of 1.1409 ³ 1 , the Internal Rate Of Return (IRR) is 7.78% > MARR, and the Payback Period (PP) value is 22 years 11 months 14 days < the investment plan age is 30 years. The sensitivity results show that the feasibility assessment of financial parameters is very sensitive to the IRR parameters for increasing expenses and decreasing revenue costs.","PeriodicalId":52838,"journal":{"name":"Jurnal Teknik Sipil","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-01-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26418/jts.v23i4.67489","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Each district or city is required to establish a Public Service Mall for services to the community, therefore the Government wants to make the Kapuas Indah Market building multifunctional which has been neglected for a long time by having a Public Service Mall on the 3rd floor of the Kapuas Indah Market with a total building area of ± 7,380m2. The construction of this renovation will certainly have various impacts so it is necessary to carry out a feasibility study in terms of technical and financial aspects.Analysis of the technical aspects carried out is based on the Basic Building Coefficient (KDB) of 78.79%, Building Floor Coefficient (KLB) of 2.36, Green Area Coefficient (KDH) of 21.20%, Parking Space Requirement of 581SRP, and Accessibility The locations reviewed are in accordance with applicable regulations and guidelines that the technical aspects of the renovation of the construction of the Kapuas Indah Market and Public Service Mall can be said to be feasible or have met the requirements in the construction of a project. While the results of the financial feasibility analysis show that the renovation project for the construction of the Kapuas Indah market and the Public Service Mall is feasible (profitable) because the results obtained using the Net Present Value (NPV) obtained a value of Rp. 10,223,725,624 > 1, the value of the Benefit Cost Ratio (BCR) of 1.1409 ³ 1 , the Internal Rate Of Return (IRR) is 7.78% > MARR, and the Payback Period (PP) value is 22 years 11 months 14 days < the investment plan age is 30 years. The sensitivity results show that the feasibility assessment of financial parameters is very sensitive to the IRR parameters for increasing expenses and decreasing revenue costs.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
卡普阿斯因达市场项目和公共服务商场项目开发改造的技术和财务可行性研究分析
每个区或城市都必须建立一个公共服务商场,为社区提供服务,因此,政府希望在 Kapuas Indah 市场的三楼建立一个公共服务商场,总建筑面积为 7380 平方米,从而使长期以来被忽视的 Kapuas Indah 市场大楼实现多功能化。对技术方面的分析是基于基本建筑系数 (KDB) 为 78.79%、建筑楼层系数 (KLB) 为 2.36、绿地系数 (KDH) 为 21.20%、停车空间需求 (KLB) 为 2.36、绿地面积需求 (KDH) 为 21.20%。20% ,停车空间要求为 581SRP ,以及无障碍设施 审查过的地点均符合适用的法规和指导方针,因此可以说 Kapuas Indah 市场和公共服务商 场翻新建设的技术方面是可行的,或者说符合项目建设的要求。财务可行性分析的结果表明,卡普阿斯因达市场和公共服务购物中心的翻新项目是可行的(有利可图),因为使用净现值(NPV)得出的结果为 10,223,725,660 印尼盾。10,223,725,624印尼盾 > 1,效益成本比 (BCR) 值为 1.1409 ³ 1,内部收益率 (IRR) 为 7.78% > MARR,投资回收期 (PP) 值为 22 年 11 个月 14 天 < 投资计划年限为 30 年。敏感性结果表明,财务参数的可行性评估对增加支出和减少收入成本的内部收益率参数非常敏感。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
12 weeks
期刊最新文献
PLANNING FOR THE DEVELOPMENT OF A DRINKING WATER DISTRIBUTION SYSTEM NETWORK IN SUNGAI PINYUH DETERMINATION OF DISCHARGE COEFFICIENT THROUGH LABORATORY TESTING USING BROAD-CRESTED WEIR DETERMINATION OF REPRESENTATIVE MOCK MODEL PARAMETERS FOR MONTHLY DISCHARGE CURVE DEVELOPMENT IN THE UPPER KAPUAS RIVER BASIN FLOW HYDROGRAPH GENERATION FOR MELAWI SUB-WATERSHED USING THE SNYDER SYNTHETIC UNIT HYDROGRAPH MODEL BRACKISH WATER DESALINATION IN SUNGAI ITIK AREA USING REVERSE OSMOSIS (RO) METHOD
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1