THE HARMONIZING MINE PLANNING IN THE EAST KALIMANTAN COKING COAL MINE: THE CHALLENGES AND IMPROVEMENTS

A. Kahfi, Dwi P. Fransiskus, Wijanarko K. Adi, Ahmad Prayogi, Luqman S. Purwosasongko
{"title":"THE HARMONIZING MINE PLANNING IN THE EAST KALIMANTAN COKING COAL MINE: THE CHALLENGES AND IMPROVEMENTS","authors":"A. Kahfi, Dwi P. Fransiskus, Wijanarko K. Adi, Ahmad Prayogi, Luqman S. Purwosasongko","doi":"10.36986/impj.v5i2.121","DOIUrl":null,"url":null,"abstract":"The coking coal mine at the research site is in the Pamaluan formation East Kalimantan. The condition of the mine has many complexities and challenges, such as natural slope condition (30º-35º), narrow pit area and low out pit dump capacity limited by land compensation issue, overburden material, geological structure, coal with very thin layers (<1 m) and consist multiple products in a layer, small number of strips and large number of blocks and high SR pit and SR balance in short range. In mine planning at the research location, many improvements need to be made so that all aspects, starting with mine planning and operations, can run smoothly and profits can be as expected. Some of the improvements that have been made at the mine such as build mine planning concepts, build fleet allocation rules, structural and stratigraphical geology modelling and improve drill & blast plan, implementation dynamic mine planning and optimize mining digital product. By implementing these improvements, significant positive impacts have been achieved, such as Consistently maintain mine planning compliance (accuracy) >97%, Maintain fleet productivity performance in range of 95% - 110%, Consistently achieving production targets >97%, Able to maintain SR balance by achieving weekly coal plan with the range of 94 - 103%, Achieving blasting performance results with a value of  >97% and Maintain work safety aspects with no accidents and loss time injury. ","PeriodicalId":479697,"journal":{"name":"Indonesian Mining Professionals Journal","volume":"116 9","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-03-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Indonesian Mining Professionals Journal","FirstCategoryId":"0","ListUrlMain":"https://doi.org/10.36986/impj.v5i2.121","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The coking coal mine at the research site is in the Pamaluan formation East Kalimantan. The condition of the mine has many complexities and challenges, such as natural slope condition (30º-35º), narrow pit area and low out pit dump capacity limited by land compensation issue, overburden material, geological structure, coal with very thin layers (<1 m) and consist multiple products in a layer, small number of strips and large number of blocks and high SR pit and SR balance in short range. In mine planning at the research location, many improvements need to be made so that all aspects, starting with mine planning and operations, can run smoothly and profits can be as expected. Some of the improvements that have been made at the mine such as build mine planning concepts, build fleet allocation rules, structural and stratigraphical geology modelling and improve drill & blast plan, implementation dynamic mine planning and optimize mining digital product. By implementing these improvements, significant positive impacts have been achieved, such as Consistently maintain mine planning compliance (accuracy) >97%, Maintain fleet productivity performance in range of 95% - 110%, Consistently achieving production targets >97%, Able to maintain SR balance by achieving weekly coal plan with the range of 94 - 103%, Achieving blasting performance results with a value of  >97% and Maintain work safety aspects with no accidents and loss time injury. 
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
东卡里曼丹炼焦煤矿协调矿区规划:挑战与改进
研究地点的炼焦煤矿位于东加里曼丹的帕马銮地层。该煤矿的条件具有许多复杂性和挑战性,例如天然斜坡条件(30º-35º)、狭窄的矿坑区域和受土地补偿问题限制的低矿坑倾倒能力、覆盖层材料、地质结构、煤层非常薄(97%)、车队生产率保持在 95% - 110%、持续实现大于 97% 的生产目标、能够通过实现 94 - 103% 的每周煤炭计划来保持 SR 平衡、实现大于 97% 的爆破性能结果以及保持无事故和无损失工时伤害的工作安全方面。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
EVALUASI HAUL ROAD DESIGN DAN OPERASI TAMBANG DILIHAT DARI ASPEK MAINTENANCE DENGAN MINECARE REAL-TIME ANALYSIS STUDY CASE PT KALTIM PRIMA COAL OPTIMALISASI BATUBARA DENGAN MENGHILANGKAN PROSES CLEANING DAN PENGARUHNYA TERHADAP KUALITAS BATUBARA DI PT BORNEO INDOBARA THE HARMONIZING MINE PLANNING IN THE EAST KALIMANTAN COKING COAL MINE: THE CHALLENGES AND IMPROVEMENTS PENGEMBANGAN SISTEM ANALISA DATA KECELAKAAN UNTUK INDUSTRI PERTAMBANGAN DENGAN MENGGUNAKAN METODE HUMAN FACTOR ANALYSIS AND CLASSIFICATION SYSTEM (HFACS) OPTIMALISASI DISPOSAL OPD LOWWALL PADA ZONA RAWA SANGAT LUNAK DAN JENUH AIR BERDASARKAN REKOMENDASI GEOTEKNIK, PT. BARASENTOSA LESTARI, SINARMAS MINING
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1