Sonlu Farklar Yöntemi Kullanılarak Geçirimsiz Baraj Tabanına Yerleştirilen Palplanş Perdesinin Yerinin Belirlenmesi

Barış Kaçak, Ertugrul Ordu, Reşat Mutlu
{"title":"Sonlu Farklar Yöntemi Kullanılarak Geçirimsiz Baraj Tabanına Yerleştirilen Palplanş Perdesinin Yerinin Belirlenmesi","authors":"Barış Kaçak, Ertugrul Ordu, Reşat Mutlu","doi":"10.29137/umagd.1351299","DOIUrl":null,"url":null,"abstract":"In water currents within the ground, a boiling event may occur if the flow direction is opposite to gravity in the outlet area of the flow floor. To prevent a boiling event, the length of the flow path is increased or a weight filter is used in the area where there is a risk of boiling. Increasing the length of the current path is possible by creating an impermeable layer in the upstream (inlet) section of the dam or by making an impermeable sheet pile wall under the dam. The construction of the sheet pile wall under an impervious dam is expensive and difficult. In this study, the sheet pile wall under the dam wall was placed in various positions between upstream region and downstream (outlet) region of the dam, and the value of the dam's seepage rate was analyzed by finite difference method. Vertical seepage rate values and safety numbers against vertical boiling have been found by taking the gradient of the hydraulic head. It has been seen that the sheet pile wall placed in the exit zone of the dam is the solution that minimizes the leakage rate, and, therefore, maximizes the vertical safety number against boiling.","PeriodicalId":23481,"journal":{"name":"Uluslararası Muhendislik Arastirma ve Gelistirme Dergisi","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-01-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Uluslararası Muhendislik Arastirma ve Gelistirme Dergisi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29137/umagd.1351299","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In water currents within the ground, a boiling event may occur if the flow direction is opposite to gravity in the outlet area of the flow floor. To prevent a boiling event, the length of the flow path is increased or a weight filter is used in the area where there is a risk of boiling. Increasing the length of the current path is possible by creating an impermeable layer in the upstream (inlet) section of the dam or by making an impermeable sheet pile wall under the dam. The construction of the sheet pile wall under an impervious dam is expensive and difficult. In this study, the sheet pile wall under the dam wall was placed in various positions between upstream region and downstream (outlet) region of the dam, and the value of the dam's seepage rate was analyzed by finite difference method. Vertical seepage rate values and safety numbers against vertical boiling have been found by taking the gradient of the hydraulic head. It has been seen that the sheet pile wall placed in the exit zone of the dam is the solution that minimizes the leakage rate, and, therefore, maximizes the vertical safety number against boiling.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
用有限差分法确定不透水坝基上的板桩帷幕位置
在地下水流中,如果水流方向与水流底层出口区域的重力方向相反,则可能发生沸腾现象。为防止沸腾,可增加水流路径的长度,或在有沸腾风险的区域使用重量过滤器。增加水流路径长度的方法是在大坝的上游(入口)部分建造防渗层,或在大坝下建造防渗板桩墙。在不透水大坝下建造板桩墙既昂贵又困难。本研究在大坝上游区和下游(出口)区之间的不同位置布置了坝墙下的板桩墙,并采用有限差分法分析了大坝的渗流率值。通过水头梯度计算出垂直渗流率值和防止垂直沸腾的安全系数。结果表明,在大坝出口区域设置的板桩墙是渗漏率最小的方案,因此也是防止沸腾的垂直安全系数最大的方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Ticari Bir Pistonlu Motorda JP8-Elementel Bor Katkısının Performansa Etkisinin Deneysel İncelenmesi Behavior of reinforced concrete beams under different angled cold joints at shear zone Pim Disk Aşınma Test Cihazı Tasarımı ve İmalatı Hem İşletmeci Hem de Kullanıcı Açısından Kent İçi Otobüs Hatlarının Performanslarının Değerlendirilmesi Thermodynamic Analysis of Liquid Steel Production in an ElectricArc Furnace
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1