Assessing cost and benefit attributes of Building Information Modelling (BIM) implementation in Malaysian public agency: PLS-SEM approach

IF 3.6 Q1 ENGINEERING, CIVIL Journal of Information Technology in Construction Pub Date : 2024-04-18 DOI:10.36680/j.itcon.2024.015
Hanan-Allah Mohamed, Norfashiha Hashim, N. M. Yusuwan, Mohd Hafiz Hanafiah, S. M. Shamsuddin
{"title":"Assessing cost and benefit attributes of Building Information Modelling (BIM) implementation in Malaysian public agency: PLS-SEM approach","authors":"Hanan-Allah Mohamed, Norfashiha Hashim, N. M. Yusuwan, Mohd Hafiz Hanafiah, S. M. Shamsuddin","doi":"10.36680/j.itcon.2024.015","DOIUrl":null,"url":null,"abstract":"One of the main constraints posed during the implementation of Building Information Modelling (BIM) is the high cost of adoption. This leads to studies related to value management in project and organizational contexts, especially for the public sector. However, the empirical measurement of BIM value must be done systematically to produce more accurate and valid results for applications. Therefore, this study attempts to pave the way for development of Cost Benefit Analysis (CBA) of BIM implementation in Malaysian Public Works Department (PWD) by determining the BIM benefit attributes that have been realized and cost attributes that are needed for that. A total of 150 survey questionnaires were distributed to four design departments in Malaysian PWD Headquarter (HQ) to be rated using 5-points Likert’s interval scale. Based on the data collected, the results were analyzed using Confirmatory Composite Analysis (CCA) as a method of confirming measurement quality (MCMQ) in Partial Least Square Structural Equation Modelling (PLS-SEM). The study model was conceptualized as a reflective-formative type II Hierarchical Component Model (HCM). The results indicate key benefit attributes and cost attributes related to two main BIM uses in Malaysian PWD current practices which are the ‘design review’ and ‘automated clash detection’. Based on the final form of the model, there was a total of eight key benefits of BIM implementation which are ‘lower cost’, ‘better scenario and alternative analysis’, ‘improved communication’, ‘improved coordination’, ‘improved output quality’, ‘better change management’, ‘less rework’, and ‘fewer error’. On the other hand, three cost attributes that were confirmed are ‘software related investment’, ‘hardware related investment’ and ‘infrastructure cost’. This paper provides researchers on the approach of confirming key items needed to measure BIM value and is hoped to assist the value analyst to perform the Value Management (VM) analyses for their projects.","PeriodicalId":51624,"journal":{"name":"Journal of Information Technology in Construction","volume":null,"pages":null},"PeriodicalIF":3.6000,"publicationDate":"2024-04-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Information Technology in Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36680/j.itcon.2024.015","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

Abstract

One of the main constraints posed during the implementation of Building Information Modelling (BIM) is the high cost of adoption. This leads to studies related to value management in project and organizational contexts, especially for the public sector. However, the empirical measurement of BIM value must be done systematically to produce more accurate and valid results for applications. Therefore, this study attempts to pave the way for development of Cost Benefit Analysis (CBA) of BIM implementation in Malaysian Public Works Department (PWD) by determining the BIM benefit attributes that have been realized and cost attributes that are needed for that. A total of 150 survey questionnaires were distributed to four design departments in Malaysian PWD Headquarter (HQ) to be rated using 5-points Likert’s interval scale. Based on the data collected, the results were analyzed using Confirmatory Composite Analysis (CCA) as a method of confirming measurement quality (MCMQ) in Partial Least Square Structural Equation Modelling (PLS-SEM). The study model was conceptualized as a reflective-formative type II Hierarchical Component Model (HCM). The results indicate key benefit attributes and cost attributes related to two main BIM uses in Malaysian PWD current practices which are the ‘design review’ and ‘automated clash detection’. Based on the final form of the model, there was a total of eight key benefits of BIM implementation which are ‘lower cost’, ‘better scenario and alternative analysis’, ‘improved communication’, ‘improved coordination’, ‘improved output quality’, ‘better change management’, ‘less rework’, and ‘fewer error’. On the other hand, three cost attributes that were confirmed are ‘software related investment’, ‘hardware related investment’ and ‘infrastructure cost’. This paper provides researchers on the approach of confirming key items needed to measure BIM value and is hoped to assist the value analyst to perform the Value Management (VM) analyses for their projects.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
评估马来西亚公共机构实施建筑信息模型(BIM)的成本和收益属性:PLS-SEM 方法
建筑信息模型(BIM)实施过程中的一个主要制约因素是采用成本过高。这导致了与项目和组织背景下的价值管理相关的研究,尤其是针对公共部门的研究。然而,BIM 价值的实证测量必须系统地进行,以产生更准确、更有效的应用结果。因此,本研究试图通过确定已实现的 BIM 效益属性和所需的成本属性,为马来西亚公共工程部(PWD)实施 BIM 的成本效益分析(CBA)的发展铺平道路。共向马来西亚公共工程部总部(HQ)的四个设计部门发放了 150 份调查问卷,采用 5 点李克特区间量表进行评分。根据收集到的数据,使用确认性综合分析法(CCA)对结果进行分析,以此确认部分最小平方结构方程模型(PLS-SEM)中的测量质量(MCMQ)。研究模型被概念化为反思-形成型 II 层次成份模型(HCM)。研究结果表明,在马来西亚公共工程设计的当前实践中,与 "设计审查 "和 "自动冲突检测 "这两种主要 BIM 用途相关的关键效益属性和成本属性。根据模型的最终形式,BIM 的实施共有八项关键效益,分别是 "降低成本"、"更好的方案和替代分析"、"改善沟通"、"改善协调"、"提高产出质量"、"改善变更管理"、"减少返工 "和 "减少错误"。另一方面,"软件相关投资"、"硬件相关投资 "和 "基础设施成本 "这三个成本属性得到了确认。本文为研究人员提供了确认衡量 BIM 价值所需的关键项目的方法,希望能帮助价值分析人员为其项目进行价值管理(VM)分析。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
6.90
自引率
8.60%
发文量
44
审稿时长
26 weeks
期刊最新文献
Least Square Moment Balanced Machine: A New Approach To Estimating Cost To Completion For Construction Projects Analysis of 5D BIM for cost estimation, cost control and payments Artificial Intelligence in Cloud Computing technology in the Construction industry: a bibliometric and systematic review Analyzing the added value of common data environments for organizational and project performance of BIM-based projects Development of standard-based information requirements for the facility management of a canteen
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1