Challenges of black construction professionals with Black Economic Empowerment as a procurement policy in South Africa

IF 1.6 Q3 PUBLIC ADMINISTRATION Journal of Public Procurement Pub Date : 2024-05-28 DOI:10.1108/jopp-05-2023-0032
Christopher Amoah
{"title":"Challenges of black construction professionals with Black Economic Empowerment as a procurement policy in South Africa","authors":"Christopher Amoah","doi":"10.1108/jopp-05-2023-0032","DOIUrl":null,"url":null,"abstract":"<h3>Purpose</h3>\n<p>The South African Government announced the black economic empowerment (BEE) legislation in 2003 in the public procurement systems. The legislation was deemed a catalyst for the emancipation of the previously disadvantaged citizens due to the apartheid government policies that secluded them from economic activities. This study aims to explore the challenges of black construction professionals with the BEE as a procurement policy.</p><!--/ Abstract__block -->\n<h3>Design/methodology/approach</h3>\n<p>This study adopted a qualitative research approach. Thirty-five black construction professionals were contacted for interviews, of which 21 responded. Due to the COVID-19 restriction, participants were interviewed using telephone interview techniques. The information received was analysed using the thematic contents analysis method.</p><!--/ Abstract__block -->\n<h3>Findings</h3>\n<p>The findings revealed the challenges confronting black construction professionals regarding the BEE policy as corrupt practices (leading to the award of contracts to unqualified people), fronting of contractors and individuals for unqualified firms, preventing the participation of experienced and foreign firms, poor policy implementation with no monitoring mechanism and loss of tender due to strict requirements.</p><!--/ Abstract__block -->\n<h3>Social implications</h3>\n<p>Urgent attention is needed to review the BEE policy implementation process by the South African government to address the challenges enumerated by the policy beneficiaries to ensure the achievement of the policy objectives.</p><!--/ Abstract__block -->\n<h3>Originality/value</h3>\n<p>This study has identified the challenges of the BEE policy; thus, the government can institute measures to address the hindrances thwarting the beneficiaries from realising the policy objectives.</p><!--/ Abstract__block -->","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":"8 1","pages":""},"PeriodicalIF":1.6000,"publicationDate":"2024-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Public Procurement","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jopp-05-2023-0032","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"PUBLIC ADMINISTRATION","Score":null,"Total":0}
引用次数: 0

Abstract

Purpose

The South African Government announced the black economic empowerment (BEE) legislation in 2003 in the public procurement systems. The legislation was deemed a catalyst for the emancipation of the previously disadvantaged citizens due to the apartheid government policies that secluded them from economic activities. This study aims to explore the challenges of black construction professionals with the BEE as a procurement policy.

Design/methodology/approach

This study adopted a qualitative research approach. Thirty-five black construction professionals were contacted for interviews, of which 21 responded. Due to the COVID-19 restriction, participants were interviewed using telephone interview techniques. The information received was analysed using the thematic contents analysis method.

Findings

The findings revealed the challenges confronting black construction professionals regarding the BEE policy as corrupt practices (leading to the award of contracts to unqualified people), fronting of contractors and individuals for unqualified firms, preventing the participation of experienced and foreign firms, poor policy implementation with no monitoring mechanism and loss of tender due to strict requirements.

Social implications

Urgent attention is needed to review the BEE policy implementation process by the South African government to address the challenges enumerated by the policy beneficiaries to ensure the achievement of the policy objectives.

Originality/value

This study has identified the challenges of the BEE policy; thus, the government can institute measures to address the hindrances thwarting the beneficiaries from realising the policy objectives.

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
南非黑人建筑专业人员在黑人经济赋权作为采购政策方面面临的挑战
目的南非政府于 2003 年在公共采购系统中宣布了黑人经济赋权(BEE)立法。由于种族隔离政府的政策将黑人排斥在经济活动之外,这项立法被认为是解放以往处于不利地位的公民的催化剂。本研究旨在探讨黑人建筑专业人士在将 BEE 作为一项采购政策时所面临的挑战。我们联系了 35 名黑人建筑专业人士进行访谈,其中 21 人做出了回应。由于 COVID-19 的限制,我们采用电话访谈技术对参与者进行了访谈。研究结果研究结果表明,黑人建筑专业人员在 BEE 政策方面面临的挑战包括腐败行为(导致将合同授予不合格人员)、承包商和个人为不合格公司打掩护、阻止有经验的外国公司参与、政策执行不力且没有监督机制以及因严格要求而失去投标机会。社会影响南非政府需要高度重视对 BEE 政策实施过程的审查,以应对政策受益人列举的挑战,确保政策目标的实现。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Journal of Public Procurement
Journal of Public Procurement PUBLIC ADMINISTRATION-
CiteScore
4.40
自引率
4.00%
发文量
13
期刊介绍: The Journal of Public Procurement (JOPP) seeks to further the understanding of public procurement. JOPP publishes original, high-quality research that explores the theories and practices of public procurement. The journal ensures that high-quality research is collected and disseminated widely to both academics and practitioners, and provides a forum for debate. It covers all subjects relating to the purchase of goods, services and works by public organizations at a local, regional, national and international level. JOPP is multi-disciplinary, with a broad approach towards methods and styles of research as well as the level of issues addressed. The Journal welcomes the submission of papers from researchers internationally. The journal welcomes research papers, narrative essays, exemplar cases, forums, and book reviews.
期刊最新文献
Approaching transcendence: a conceptual discussion on procurement fraud, education, professionalism maturity, ethics and implications Procurement practices and operational performance: a study of linear and curvilinear relationships in a developing economy The predicting role of sustainable supplier selection on lead-time performance in public procurement: relational capability as a moderator Challenges of black construction professionals with Black Economic Empowerment as a procurement policy in South Africa Streamlining professionalisation in public procurement: Romanian competency frameworks as a case study (Part B)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1