The delivery of multiple benefits on the Llyn Tegid reservoir safety improvements project

Andrew Basford
{"title":"The delivery of multiple benefits on the Llyn Tegid reservoir safety improvements project","authors":"Andrew Basford","doi":"10.1680/jdare.2024.12","DOIUrl":null,"url":null,"abstract":"When Wales' largest natural lake, Llyn Tegid, required significant reservoir safety works, the execution of sympathetic yet well-engineering solutions ensured that the scheme could stand the test of time and achieve multiple benefits for future generations. Placing sustainability at its heart, the scheme, delivered in Spring 2023, totalling £7 million, has involved strengthening works to 3 km of embankments to protect the popular tourist town of Bala from extreme weather. Boosting the wellbeing of residents and visitors within the picturesque Snowdonia landscape, works on the high-risk reservoir did not come without unique challenges. From designing for overflowing events and significant mature tree removal, to protecting internationally important habitats and working within the live reservoir basin, to name just a few. The scheme's success has been a testament to building the right team, implementing the right contractual and management controls, and establishing the right culture for compliant and high-quality solutions. Opportunities for carbon reduction and maximising value for money have been taken alongside new works to facilitate possible future expansion of Bala Lake Railway. Involving the community at every stage of this award-winning scheme, the delivery of benefits has been many, and the experiences are ones to live on for all.","PeriodicalId":505716,"journal":{"name":"Dams and Reservoirs","volume":"107 3","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-07-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Dams and Reservoirs","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jdare.2024.12","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

When Wales' largest natural lake, Llyn Tegid, required significant reservoir safety works, the execution of sympathetic yet well-engineering solutions ensured that the scheme could stand the test of time and achieve multiple benefits for future generations. Placing sustainability at its heart, the scheme, delivered in Spring 2023, totalling £7 million, has involved strengthening works to 3 km of embankments to protect the popular tourist town of Bala from extreme weather. Boosting the wellbeing of residents and visitors within the picturesque Snowdonia landscape, works on the high-risk reservoir did not come without unique challenges. From designing for overflowing events and significant mature tree removal, to protecting internationally important habitats and working within the live reservoir basin, to name just a few. The scheme's success has been a testament to building the right team, implementing the right contractual and management controls, and establishing the right culture for compliant and high-quality solutions. Opportunities for carbon reduction and maximising value for money have been taken alongside new works to facilitate possible future expansion of Bala Lake Railway. Involving the community at every stage of this award-winning scheme, the delivery of benefits has been many, and the experiences are ones to live on for all.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在 Llyn Tegid 水库安全改进项目中实现多重效益
当威尔士最大的天然湖泊 Llyn Tegid 需要进行重大的水库安全工程时,我们采用了富有同情心但又精心设计的解决方案,确保该计划能够经受住时间的考验,并为子孙后代带来多重益处。该计划以可持续发展为核心,于 2023 年春季交付,总投资达 700 万英镑,包括加固 3 公里长的堤坝,以保护著名旅游城市巴拉免受极端天气的影响。为了提高居民和游客在风景如画的斯诺多尼亚地区的生活质量,该高风险水库的工程面临着许多独特的挑战。从设计溢流事件和大量移除成龄树,到保护具有国际重要性的栖息地和在活水库盆地内施工等等,不一而足。该计划的成功证明了建立了正确的团队、实施了正确的合同和管理控制,以及建立了正确的文化,从而提供了合规和高质量的解决方案。在开展新工程的同时,还抓住了减少碳排放和实现资金效益最大化的机会,为巴拉湖铁路未来可能的扩建提供了便利。在这一屡获殊荣的项目中,社区参与了项目的每一个阶段,从而获得了诸多益处,这些经验也将为所有人所铭记。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
An updated reference table for extreme flood hydrology methods at UK dams The delivery of multiple benefits on the Llyn Tegid reservoir safety improvements project Efficiency of labyrinth vs ogee spillways at high hydraulic heads - case study in Zambia A Moorland dam - remedial grouting works ICOLD 2023, Gothenburg Sweden – Report on Workshop 4
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1