Compliance of Haditha Dam in Iraq to the International Standards for Surveillance and Monitoring

IF 1.7 Q2 ENGINEERING, MULTIDISCIPLINARY Journal of Engineering Pub Date : 2024-07-01 DOI:10.31026/j.eng.2024.07.03
Alyaa Jumaah Hadi, Thamer Ahmed Mohammed
{"title":"Compliance of Haditha Dam in Iraq to the International Standards for Surveillance and Monitoring","authors":"Alyaa Jumaah Hadi, Thamer Ahmed Mohammed","doi":"10.31026/j.eng.2024.07.03","DOIUrl":null,"url":null,"abstract":"Dams are mega structures that retain huge volumes of water and their safety is important to national security, economy, and public interest. In this study, the types of regular measurements with their recorded value for Haditha Dam were checked for compliance with the standard international surveillance and monitoring procedures such as the procedures of the International Commission on Large Dams (ICOLD), the United States Bureau of Reclamation (USBR)and other to ensure safe dam operation and to avoid the scenario of the Derna Dam break, in Libya that occurred in September 2023. The result shows that the highest recorded settlement was found at station 41 on the left side of the dam body exceeding the design criteria (219 mm) by about 51 %, the frequency of measurement does not comply with the required international standards. There are 7 cells of pore pressure that exceeded the design criteria and the greatest percentage of exceedance was 21.57 % was found at pore pressure number 995. For piezometer reading, the percentage exceedance was 9.1% and it was found on the left side at piezometers number 58-8. The highest percentage of movement 62 % was found at join meter device number D18. The recorded seepage rate through the dam was found within the permitted limits. The visual inspection followed at Haditha Dam was not according to the standard required inspection.","PeriodicalId":15716,"journal":{"name":"Journal of Engineering","volume":null,"pages":null},"PeriodicalIF":1.7000,"publicationDate":"2024-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31026/j.eng.2024.07.03","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

Abstract

Dams are mega structures that retain huge volumes of water and their safety is important to national security, economy, and public interest. In this study, the types of regular measurements with their recorded value for Haditha Dam were checked for compliance with the standard international surveillance and monitoring procedures such as the procedures of the International Commission on Large Dams (ICOLD), the United States Bureau of Reclamation (USBR)and other to ensure safe dam operation and to avoid the scenario of the Derna Dam break, in Libya that occurred in September 2023. The result shows that the highest recorded settlement was found at station 41 on the left side of the dam body exceeding the design criteria (219 mm) by about 51 %, the frequency of measurement does not comply with the required international standards. There are 7 cells of pore pressure that exceeded the design criteria and the greatest percentage of exceedance was 21.57 % was found at pore pressure number 995. For piezometer reading, the percentage exceedance was 9.1% and it was found on the left side at piezometers number 58-8. The highest percentage of movement 62 % was found at join meter device number D18. The recorded seepage rate through the dam was found within the permitted limits. The visual inspection followed at Haditha Dam was not according to the standard required inspection.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
伊拉克哈迪萨大坝是否符合国际监督和监测标准
大坝是蓄水量巨大的巨型建筑,其安全对国家安全、经济和公众利益都非常重要。在这项研究中,对哈迪萨大坝的定期测量类型及其记录值进行了检查,以确保其符合国际监督和监测标准程序,如国际大型水坝委员会(ICOLD)、美国垦务局(USBR)和其他机构的程序,从而确保大坝的安全运行,避免出现 2023 年 9 月在利比亚发生的德尔纳大坝决堤事件。结果显示,坝体左侧第 41 站的沉降记录最高,超过设计标准(219 毫米)约 51%,测量频率不符合规定的国际标准。有 7 个孔隙压力单元超过了设计标准,最大的超标百分比为 21.57%,出现在孔隙压力编号 995 处。压强计读数的超标百分比为 9.1%,位于 58-8 号压强计的左侧。最高的移动百分比为 62%,出现在 D18 号连接计装置处。大坝的记录渗流率在允许范围内。哈迪塔大坝的目视检查不符合标准要求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Journal of Engineering
Journal of Engineering ENGINEERING, MULTIDISCIPLINARY-
CiteScore
4.20
自引率
0.00%
发文量
68
期刊介绍: Journal of Engineering is a peer-reviewed, Open Access journal that publishes original research articles as well as review articles in several areas of engineering. The subject areas covered by the journal are: - Chemical Engineering - Civil Engineering - Computer Engineering - Electrical Engineering - Industrial Engineering - Mechanical Engineering
期刊最新文献
Compliance of Haditha Dam in Iraq to the International Standards for Surveillance and Monitoring Modelling Technical Capacity of Industrial Machines Suppliers’ Selection Post Engineering and Economic Considerations Design and Implementation of a Microstrip Six-Port Reflectometer (SPR) with Enhanced Bandwidth Analysis the Reliability of Travel Time in Urban Corridors in Baghdad City The Financial Crisis Affecting the Construction Sector
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1