{"title":"Project governance: the impact of environmental changes on governance adaptations in large-scale projects","authors":"Lavagnon Ika, Jack Meredith, Ofer Zwikael","doi":"10.1108/ijmpb-03-2024-0056","DOIUrl":null,"url":null,"abstract":"<h3>Purpose</h3>\n<p>The performance of large-scale projects is often challenged due to major environmental changes that occur during their life. However, literature has paid little attention to the governance adaptations required to respond effectively to these changes. This paper aims to study changes in the project environment over time, the corresponding governance adaptations and their impact on project performance.</p><!--/ Abstract__block -->\n<h3>Design/methodology/approach</h3>\n<p>To ensure triangulation between two sources of evidence, we used both primary and secondary data sources and examined 14 projects through 2 studies, the first focused on seven documented, illustrative case projects and the second on interviews with senior and project managers involved in seven additional projects.</p><!--/ Abstract__block -->\n<h3>Findings</h3>\n<p>We found the key environmental changes that should trigger appropriate governance adaptations to be market evolutions, technological advancements and sociopolitical events. However, we also found that these necessary governance adaptations are not commonly implemented timely, sufficiently or effectively.</p><!--/ Abstract__block -->\n<h3>Originality/value</h3>\n<p>The paper distills the dynamics of large-scale projects in achieving project effectiveness and raises theoretical propositions on the combination of environmental changes and deficient governance adaptations that, over time, turns efficient projects into ineffective projects and discusses implications for theory and practice.</p><!--/ Abstract__block -->","PeriodicalId":2,"journal":{"name":"ACS Applied Bio Materials","volume":null,"pages":null},"PeriodicalIF":4.6000,"publicationDate":"2024-09-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ACS Applied Bio Materials","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1108/ijmpb-03-2024-0056","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MATERIALS SCIENCE, BIOMATERIALS","Score":null,"Total":0}
引用次数: 0

Abstract

Purpose

The performance of large-scale projects is often challenged due to major environmental changes that occur during their life. However, literature has paid little attention to the governance adaptations required to respond effectively to these changes. This paper aims to study changes in the project environment over time, the corresponding governance adaptations and their impact on project performance.

Design/methodology/approach

To ensure triangulation between two sources of evidence, we used both primary and secondary data sources and examined 14 projects through 2 studies, the first focused on seven documented, illustrative case projects and the second on interviews with senior and project managers involved in seven additional projects.

Findings

We found the key environmental changes that should trigger appropriate governance adaptations to be market evolutions, technological advancements and sociopolitical events. However, we also found that these necessary governance adaptations are not commonly implemented timely, sufficiently or effectively.

Originality/value

The paper distills the dynamics of large-scale projects in achieving project effectiveness and raises theoretical propositions on the combination of environmental changes and deficient governance adaptations that, over time, turns efficient projects into ineffective projects and discusses implications for theory and practice.

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
项目治理:环境变化对大型项目治理调整的影响
目的 大型项目的绩效往往因其生命周期内发生的重大环境变化而受到挑战。然而,文献很少关注有效应对这些变化所需的治理调整。本文旨在研究项目环境随时间推移而发生的变化、相应的治理调整及其对项目绩效的影响。为了确保两种证据来源之间的三角测量,我们使用了第一手和第二手数据来源,并通过两项研究对 14 个项目进行了考察,第一项研究侧重于 7 个记录在案的说明性案例项目,第二项研究侧重于对参与另外 7 个项目的高层和项目经理的访谈。原创性/价值 本文提炼了大型项目在实现项目有效性方面的动态变化,并就环境变化与治理适应性不足的结合提出了理论命题,随着时间的推移,有效的项目会变成无效的项目,并讨论了对理论和实践的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
ACS Applied Bio Materials
ACS Applied Bio Materials Chemistry-Chemistry (all)
CiteScore
9.40
自引率
2.10%
发文量
464
期刊最新文献
A Systematic Review of Sleep Disturbance in Idiopathic Intracranial Hypertension. Advancing Patient Education in Idiopathic Intracranial Hypertension: The Promise of Large Language Models. Anti-Myelin-Associated Glycoprotein Neuropathy: Recent Developments. Approach to Managing the Initial Presentation of Multiple Sclerosis: A Worldwide Practice Survey. Association Between LACE+ Index Risk Category and 90-Day Mortality After Stroke.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1