{"title":"Mechanism for allocating delay to constituent activities in project management","authors":"Haoqing Wang , Wei Wang , Zhongyi Jin","doi":"10.1016/j.cie.2024.110603","DOIUrl":null,"url":null,"abstract":"<div><div>Project delays are common in construction due to unavoidable factors such as severe weather and human factors such as poor planning. These delays originate from the constituent activities within the project. A critical challenge in project management is accurately assigning delays to specific activities. However, this issue remains poorly understood. This study aims to address the allocation of delays to constituent activities by developing a mechanism using the Shapley value. We also propose solution methods to effectively solve the delay allocation problem. Moreover, we conduct numerical experiments that demonstrate the efficiency and applicability of the proposed mechanism and solution methods. This study can provide guidelines for allocating project delays (e.g., identifying the activity that contributes most to project delay) and project appraisal. Overall, this study contributes to a better understanding of the allocation of project delays, providing reference for project management and decision-making in the construction industry.</div></div>","PeriodicalId":55220,"journal":{"name":"Computers & Industrial Engineering","volume":null,"pages":null},"PeriodicalIF":6.7000,"publicationDate":"2024-09-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Computers & Industrial Engineering","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0360835224007241","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"COMPUTER SCIENCE, INTERDISCIPLINARY APPLICATIONS","Score":null,"Total":0}
引用次数: 0
Abstract
Project delays are common in construction due to unavoidable factors such as severe weather and human factors such as poor planning. These delays originate from the constituent activities within the project. A critical challenge in project management is accurately assigning delays to specific activities. However, this issue remains poorly understood. This study aims to address the allocation of delays to constituent activities by developing a mechanism using the Shapley value. We also propose solution methods to effectively solve the delay allocation problem. Moreover, we conduct numerical experiments that demonstrate the efficiency and applicability of the proposed mechanism and solution methods. This study can provide guidelines for allocating project delays (e.g., identifying the activity that contributes most to project delay) and project appraisal. Overall, this study contributes to a better understanding of the allocation of project delays, providing reference for project management and decision-making in the construction industry.
期刊介绍:
Computers & Industrial Engineering (CAIE) is dedicated to researchers, educators, and practitioners in industrial engineering and related fields. Pioneering the integration of computers in research, education, and practice, industrial engineering has evolved to make computers and electronic communication integral to its domain. CAIE publishes original contributions focusing on the development of novel computerized methodologies to address industrial engineering problems. It also highlights the applications of these methodologies to issues within the broader industrial engineering and associated communities. The journal actively encourages submissions that push the boundaries of fundamental theories and concepts in industrial engineering techniques.