Mechanism for allocating delay to constituent activities in project management

IF 6.7 1区 工程技术 Q1 COMPUTER SCIENCE, INTERDISCIPLINARY APPLICATIONS Computers & Industrial Engineering Pub Date : 2024-09-24 DOI:10.1016/j.cie.2024.110603
Haoqing Wang , Wei Wang , Zhongyi Jin
{"title":"Mechanism for allocating delay to constituent activities in project management","authors":"Haoqing Wang ,&nbsp;Wei Wang ,&nbsp;Zhongyi Jin","doi":"10.1016/j.cie.2024.110603","DOIUrl":null,"url":null,"abstract":"<div><div>Project delays are common in construction due to unavoidable factors such as severe weather and human factors such as poor planning. These delays originate from the constituent activities within the project. A critical challenge in project management is accurately assigning delays to specific activities. However, this issue remains poorly understood. This study aims to address the allocation of delays to constituent activities by developing a mechanism using the Shapley value. We also propose solution methods to effectively solve the delay allocation problem. Moreover, we conduct numerical experiments that demonstrate the efficiency and applicability of the proposed mechanism and solution methods. This study can provide guidelines for allocating project delays (e.g., identifying the activity that contributes most to project delay) and project appraisal. Overall, this study contributes to a better understanding of the allocation of project delays, providing reference for project management and decision-making in the construction industry.</div></div>","PeriodicalId":55220,"journal":{"name":"Computers & Industrial Engineering","volume":null,"pages":null},"PeriodicalIF":6.7000,"publicationDate":"2024-09-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Computers & Industrial Engineering","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0360835224007241","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"COMPUTER SCIENCE, INTERDISCIPLINARY APPLICATIONS","Score":null,"Total":0}
引用次数: 0

Abstract

Project delays are common in construction due to unavoidable factors such as severe weather and human factors such as poor planning. These delays originate from the constituent activities within the project. A critical challenge in project management is accurately assigning delays to specific activities. However, this issue remains poorly understood. This study aims to address the allocation of delays to constituent activities by developing a mechanism using the Shapley value. We also propose solution methods to effectively solve the delay allocation problem. Moreover, we conduct numerical experiments that demonstrate the efficiency and applicability of the proposed mechanism and solution methods. This study can provide guidelines for allocating project delays (e.g., identifying the activity that contributes most to project delay) and project appraisal. Overall, this study contributes to a better understanding of the allocation of project delays, providing reference for project management and decision-making in the construction industry.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在项目管理中将延迟分配给组成活动的机制
由于恶劣天气等不可避免的因素和计划不周等人为因素,项目延误在施工中很常见。这些延误源于项目中的各项活动。项目管理中的一个关键挑战是准确地将延误分配给特定的活动。然而,人们对这一问题仍然知之甚少。本研究旨在通过开发一种使用 Shapley 值的机制来解决将延迟分配给组成活动的问题。我们还提出了有效解决延迟分配问题的方法。此外,我们还进行了数值实验,证明了所提出的机制和解决方法的效率和适用性。本研究可为项目延迟分配(例如,确定对项目延迟贡献最大的活动)和项目评估提供指导。总之,本研究有助于更好地理解项目延误的分配,为建筑行业的项目管理和决策提供参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Computers & Industrial Engineering
Computers & Industrial Engineering 工程技术-工程:工业
CiteScore
12.70
自引率
12.70%
发文量
794
审稿时长
10.6 months
期刊介绍: Computers & Industrial Engineering (CAIE) is dedicated to researchers, educators, and practitioners in industrial engineering and related fields. Pioneering the integration of computers in research, education, and practice, industrial engineering has evolved to make computers and electronic communication integral to its domain. CAIE publishes original contributions focusing on the development of novel computerized methodologies to address industrial engineering problems. It also highlights the applications of these methodologies to issues within the broader industrial engineering and associated communities. The journal actively encourages submissions that push the boundaries of fundamental theories and concepts in industrial engineering techniques.
期刊最新文献
Joint optimization of opportunistic maintenance and speed control for continuous process manufacturing systems considering stochastic imperfect maintenance Production line location strategy for foreign manufacturer when selling in a market lag behind in manufacturing Bi-objective optimization for equipment system-of-systems development planning using a novel co-evolutionary algorithm based on NSGA-II and HypE Artificial intelligence abnormal driving behavior detection for mitigating traffic accidents Design and strategy selection for quality incentive mechanisms in the public cloud manufacturing model
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1