Process scheduling for prefabricated construction based on multi-objective optimization algorithm

IF 9.6 1区 工程技术 Q1 CONSTRUCTION & BUILDING TECHNOLOGY Automation in Construction Pub Date : 2024-10-14 DOI:10.1016/j.autcon.2024.105809
Yan Li , Jiajun Wu , Yi Hao , Yuchen Gao , Runqi Chai , Senchun Chai , Baihai Zhang
{"title":"Process scheduling for prefabricated construction based on multi-objective optimization algorithm","authors":"Yan Li ,&nbsp;Jiajun Wu ,&nbsp;Yi Hao ,&nbsp;Yuchen Gao ,&nbsp;Runqi Chai ,&nbsp;Senchun Chai ,&nbsp;Baihai Zhang","doi":"10.1016/j.autcon.2024.105809","DOIUrl":null,"url":null,"abstract":"<div><div>Prefabricated construction has become an increasingly important focus area in the development of the construction industry. Determining an optimal construction process scheduling program is an urgent challenge during the project execution stage. This paper presents a multi-objective optimization problem with the objective function of minimizing the total construction time and maximizing the coordinated scheduling coefficient, and proposes a non-dominated sorting genetic algorithm based on the subspecies differentiation strategy (SD-NSGA) to solve the problem. The algorithm extends the competition phenomenon at the individual level to the subpopulation level in the traditional genetic algorithm (GA). The results demonstrate that SD-NSGA exhibits superior optimization capabilities. Compared with the initial scheme of a real residential construction project, the total working time is shortened by 35.49% and the integrated dispatch factor is increased by 365.79%. Therefore, the proposed algorithm can offer a valuable reference for determining scheduling plans in practical engineering projects.<span><span><sup>1</sup></span></span></div></div>","PeriodicalId":8660,"journal":{"name":"Automation in Construction","volume":"168 ","pages":"Article 105809"},"PeriodicalIF":9.6000,"publicationDate":"2024-10-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Automation in Construction","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0926580524005454","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

Abstract

Prefabricated construction has become an increasingly important focus area in the development of the construction industry. Determining an optimal construction process scheduling program is an urgent challenge during the project execution stage. This paper presents a multi-objective optimization problem with the objective function of minimizing the total construction time and maximizing the coordinated scheduling coefficient, and proposes a non-dominated sorting genetic algorithm based on the subspecies differentiation strategy (SD-NSGA) to solve the problem. The algorithm extends the competition phenomenon at the individual level to the subpopulation level in the traditional genetic algorithm (GA). The results demonstrate that SD-NSGA exhibits superior optimization capabilities. Compared with the initial scheme of a real residential construction project, the total working time is shortened by 35.49% and the integrated dispatch factor is increased by 365.79%. Therefore, the proposed algorithm can offer a valuable reference for determining scheduling plans in practical engineering projects.1
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于多目标优化算法的预制建筑工艺调度
预制建筑已成为建筑业发展中一个日益重要的重点领域。在项目实施阶段,如何确定最优的施工过程调度方案是一个亟待解决的难题。本文提出了一个目标函数为总施工时间最小化和协调调度系数最大化的多目标优化问题,并提出了一种基于亚种分化策略的非支配排序遗传算法(SD-NSGA)来解决该问题。该算法将传统遗传算法(GA)中个体层面的竞争现象扩展到子种群层面。结果表明,SD-NSGA 表现出卓越的优化能力。与实际住宅建筑项目的初始方案相比,总工作时间缩短了 35.49%,综合调度系数提高了 365.79%。因此,所提出的算法可为实际工程项目中确定调度计划提供有价值的参考1。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Automation in Construction
Automation in Construction 工程技术-工程:土木
CiteScore
19.20
自引率
16.50%
发文量
563
审稿时长
8.5 months
期刊介绍: Automation in Construction is an international journal that focuses on publishing original research papers related to the use of Information Technologies in various aspects of the construction industry. The journal covers topics such as design, engineering, construction technologies, and the maintenance and management of constructed facilities. The scope of Automation in Construction is extensive and covers all stages of the construction life cycle. This includes initial planning and design, construction of the facility, operation and maintenance, as well as the eventual dismantling and recycling of buildings and engineering structures.
期刊最新文献
Construction safety inspection with contrastive language-image pre-training (CLIP) image captioning and attention Signs on glasses: LiDAR data voids, hotspot effect, and reflection artifacts Automated physics-based modeling of construction equipment through data fusion Automated daily report generation from construction videos using ChatGPT and computer vision Automated rule-based safety inspection and compliance checking of temporary guardrail systems in construction
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1