Research on the Design and Construction Process of National Indoor General Stadium for Tokyo Olympics

IF 0.8 0 ARCHITECTURE Japan Architectural Review Pub Date : 2025-03-30 DOI:10.1002/2475-8876.70017
Saikaku Toyokawa
{"title":"Research on the Design and Construction Process of National Indoor General Stadium for Tokyo Olympics","authors":"Saikaku Toyokawa","doi":"10.1002/2475-8876.70017","DOIUrl":null,"url":null,"abstract":"<p>This study clarified the following three points regarding the National Indoor General Stadium for the Tokyo Olympics: (1) By organizing the official meeting schedule and construction process chart, the symbol zones were discussed at several meetings, and the construction of the symbol zone was done simultaneously with multiple constructions. (2) Using official minutes and publications, the development process of the festival square was visually organized. (3) Various collaborative designs were created for the festival square. Tange understood the limitations of time and budget and successfully crystallized the ideas of the participating members.</p>","PeriodicalId":42793,"journal":{"name":"Japan Architectural Review","volume":"8 1","pages":""},"PeriodicalIF":0.8000,"publicationDate":"2025-03-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1002/2475-8876.70017","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Japan Architectural Review","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/2475-8876.70017","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"0","JCRName":"ARCHITECTURE","Score":null,"Total":0}
引用次数: 0

Abstract

This study clarified the following three points regarding the National Indoor General Stadium for the Tokyo Olympics: (1) By organizing the official meeting schedule and construction process chart, the symbol zones were discussed at several meetings, and the construction of the symbol zone was done simultaneously with multiple constructions. (2) Using official minutes and publications, the development process of the festival square was visually organized. (3) Various collaborative designs were created for the festival square. Tange understood the limitations of time and budget and successfully crystallized the ideas of the participating members.

Abstract Image

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
东京奥运会国家室内综合体育场设计与施工过程研究
本研究阐明了有关东京奥运会国家室内综合体育馆的以下三点:(1) 通过整理官方会议日程表和施工流程图,在多次会议上讨论了标志区,并在多项施工中同时进行了标志区的施工。(2) 利用官方会议记录和出版物,直观地整理了节日广场的开发过程。(3) 为庆典广场进行了各种合作设计。丹下理解时间和预算的限制,成功地将参与成员的想法具体化。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
1.20
自引率
11.10%
发文量
58
审稿时长
15 weeks
期刊最新文献
Numerical Study of Particulate Pollutants Removal by Ventilation, Portable Air Cleaner, and Gravitational Settling Across Particle Sizes Applicability of Multi-Agent Simulation for Crowd Control After a Large-Scale Event Issue Information An Approach for HVAC Operational Improvement Using Machine Learning Models to Achieve a Comfortable Indoor Thermal Environment and Air Quality Association Between Personal Workspace in Office and Work Engagement After 1 Year Stratified by Psychological Stress Status
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1