Calculation of Optimum Soil Conditioning in EPB Tunneling (Case Study: Ahwaz Metro Project, Line 1)

IF 1.1 Q3 MINING & MINERAL PROCESSING Journal of Mining and Environment Pub Date : 2021-04-01 DOI:10.22044/JME.2021.10664.2025
H. Masoumi, A. Abdollahipour, Kh. Baghernia
{"title":"Calculation of Optimum Soil Conditioning in EPB Tunneling (Case Study: Ahwaz Metro Project, Line 1)","authors":"H. Masoumi, A. Abdollahipour, Kh. Baghernia","doi":"10.22044/JME.2021.10664.2025","DOIUrl":null,"url":null,"abstract":"Determination of the optimum soil conditioning parameters in the earth pressure balance-tunnel boring machines (EPB-TBMs) plays an important role in reaching an optimum thrust force and advance speed. Silty-clay (CL-ML) in line 1 of the Ahwaz metro project is used in order to find the conditioning parameters of slumps with different water contents and foam agents. The results obtained are a quantitative comparison between the parameters with different soil conditioning and water contents. Hence, the test results can be used to determine the most economical and technical conditioning parameters for a special condition of soil. The optimum quantity of foam expansion ratio (FER), foam injection ratio (FIR), percent ratio between the surfactant agent and the water volume (Cf), and cost for foam in this soil (based on the soil conditioning production cost) are 10, 157%, 2.07, 248 units, respectively. Soil conditioning with the optimum parameters obtained are tested in a TBM in two stages during excavation of 140 rings. This results in a lower soil conditioning cost and almost 40% higher advance speed.","PeriodicalId":45259,"journal":{"name":"Journal of Mining and Environment","volume":null,"pages":null},"PeriodicalIF":1.1000,"publicationDate":"2021-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Mining and Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22044/JME.2021.10664.2025","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
引用次数: 0

Abstract

Determination of the optimum soil conditioning parameters in the earth pressure balance-tunnel boring machines (EPB-TBMs) plays an important role in reaching an optimum thrust force and advance speed. Silty-clay (CL-ML) in line 1 of the Ahwaz metro project is used in order to find the conditioning parameters of slumps with different water contents and foam agents. The results obtained are a quantitative comparison between the parameters with different soil conditioning and water contents. Hence, the test results can be used to determine the most economical and technical conditioning parameters for a special condition of soil. The optimum quantity of foam expansion ratio (FER), foam injection ratio (FIR), percent ratio between the surfactant agent and the water volume (Cf), and cost for foam in this soil (based on the soil conditioning production cost) are 10, 157%, 2.07, 248 units, respectively. Soil conditioning with the optimum parameters obtained are tested in a TBM in two stages during excavation of 140 rings. This results in a lower soil conditioning cost and almost 40% higher advance speed.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
土压平衡隧道施工中最佳土壤条件的计算(案例研究:Ahwaz地铁1号线项目)
土压平衡式隧道掘进机中最佳土体调节参数的确定对获得最佳推进力和推进速度具有重要意义。以阿瓦士地铁1号线粉粘土(CL-ML)为研究对象,寻找不同含水率和不同发泡剂对滑塌的调理参数。所得结果是对不同土壤条件和含水量条件下各参数的定量比较。因此,试验结果可用于确定特殊土壤条件下最经济、最技术的调节参数。泡沫膨胀比(FER)、泡沫注入比(FIR)、表面活性剂与体积的百分比比(Cf)和泡沫成本(基于土壤调节生产成本)的最佳用量分别为10、157%、2.07、248单位。在掘进机上分两阶段对140个环的开挖过程进行了土壤调节试验。这降低了土壤调节成本,推进速度提高了近40%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Journal of Mining and Environment
Journal of Mining and Environment MINING & MINERAL PROCESSING-
CiteScore
1.90
自引率
25.00%
发文量
0
期刊最新文献
Fe3O4@TiO2@V2O5 as an efficient magnetic nanoparticle for synthesis of di-indolyl oxindole derivatives Propose a viable stabilization method for slope in weak rock mass environment using numerical modelling: A case study from the cut slopes Estimation of optimum geometric configuration of mine dumps in Wardha valley coalfields in India: a case study An investigation on tailing slurry transport in Kooshk lead-zinc mine in Iran based on non-Newtonian fluid rheology: an experimental study Carnallite Flotation of Khur Biabanak Potash Complex using kimiaflot 619 as a New Collector
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1