Effects of lagging projectification in the public sector on realizing infrastructure projects

R. Wagner, M. Radujković
{"title":"Effects of lagging projectification in the public sector on realizing infrastructure projects","authors":"R. Wagner, M. Radujković","doi":"10.2478/otmcj-2022-0002","DOIUrl":null,"url":null,"abstract":"Abstract The public sector in Germany lags behind the economy in terms of projectification, i.e., the prevalence of projects and experience in applying project management. This has significant implications for realizing complex infrastructure projects in which the public sector is involved as one of the main actors. Nowadays, projectification represents a particular way of thinking about how to embrace a series of dynamic and challenging changes, design them, and implement them effectively for the benefit of society. A quantitative study of projectification in society in Germany was the starting point for our research, the results of which we compared with data from earlier studies of projectification in the economy. Using an interpretative case study drawing on insights from the Berlin Airport, we analyzed the impact of lagging projectification in the public sector in Germany on realizing infrastructure projects to propose suitable approaches. The results of this case study reveal significant effects of lagging projectification in the public sector of Germany on realizing infrastructure projects. In the case of the Berlin BER Airport, an inadequate governance system led to a 9-year delay in the completion date and a 250% overrun of costs directly attributable to the project. This could have been avoided by involving the private construction industry more collaboratively, by building on previous experiences gained, and by a more cooperative way of project planning and implementation. To guide future research, hypotheses are derived that can be used to analyze the underlying problem in greater depth and to derive recommendations for action.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"14 1","pages":"2559 - 2570"},"PeriodicalIF":1.6000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Organization Technology and Management in Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/otmcj-2022-0002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 5

Abstract

Abstract The public sector in Germany lags behind the economy in terms of projectification, i.e., the prevalence of projects and experience in applying project management. This has significant implications for realizing complex infrastructure projects in which the public sector is involved as one of the main actors. Nowadays, projectification represents a particular way of thinking about how to embrace a series of dynamic and challenging changes, design them, and implement them effectively for the benefit of society. A quantitative study of projectification in society in Germany was the starting point for our research, the results of which we compared with data from earlier studies of projectification in the economy. Using an interpretative case study drawing on insights from the Berlin Airport, we analyzed the impact of lagging projectification in the public sector in Germany on realizing infrastructure projects to propose suitable approaches. The results of this case study reveal significant effects of lagging projectification in the public sector of Germany on realizing infrastructure projects. In the case of the Berlin BER Airport, an inadequate governance system led to a 9-year delay in the completion date and a 250% overrun of costs directly attributable to the project. This could have been avoided by involving the private construction industry more collaboratively, by building on previous experiences gained, and by a more cooperative way of project planning and implementation. To guide future research, hypotheses are derived that can be used to analyze the underlying problem in greater depth and to derive recommendations for action.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
公共部门项目化滞后对基础设施项目实现的影响
摘要德国公共部门在项目化方面落后于经济,即项目的普及率和应用项目管理的经验。这对实现公共部门作为主要行动者之一参与的复杂基础设施项目具有重大影响。如今,项目化代表了一种特殊的思维方式,即如何接受一系列动态和具有挑战性的变化,设计并有效实施这些变化,以造福社会。对德国社会项目化的定量研究是我们研究的起点,我们将研究结果与早期经济项目化研究的数据进行了比较。利用柏林机场的解释性案例研究,我们分析了德国公共部门项目化滞后对实现基础设施项目的影响,以提出合适的方法。该案例研究的结果揭示了德国公共部门项目化滞后对基础设施项目实现的显著影响。就柏林BER机场而言,治理系统不足导致竣工日期延迟了9年,直接归因于该项目的成本超支了250%。通过让私营建筑业更加合作,在以往经验的基础上再接再厉,以及通过项目规划和实施的更加合作的方式,本可以避免这种情况。为了指导未来的研究,我们提出了一些假设,这些假设可用于更深入地分析潜在问题,并提出行动建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
3.10
自引率
0.00%
发文量
8
审稿时长
16 weeks
期刊最新文献
Project success and critical success factors of construction projects: project practitioners’ perspectives Exploring the social legitimacy of urban road PPPs in Nigeria Capability improvement measures of the public sector for implementation of building information modeling in construction projects Linking life cycle BIM data to a facility management system using Revit Dynamo Investigation of the poor-quality practices on building construction sites in Malaysia
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1