Lead-time setting, capacity utilization, and pricing decisions under lead-time dependent demand

Kondalarao Palaka, Steven J. Erlebacher, D. Kropp
{"title":"Lead-time setting, capacity utilization, and pricing decisions under lead-time dependent demand","authors":"Kondalarao Palaka, Steven J. Erlebacher, D. Kropp","doi":"10.1080/07408179808966447","DOIUrl":null,"url":null,"abstract":"This research examines the lead-time setting, capacity utilization, and pricing decisions facing a firm serving customers that are sensitive to quoted lead-times. We model the firm's operations as an M/M/1 queue and treat the demand as being linear in price and quoted lead-time. We analyze the quoted lead-time, capacity utilization, and price that maximize revenues less total variable production costs, WIP holding costs, and lateness penalty costs. We use this analysis to show that the capacity utilization should be lower when (1) customers are more sensitive to lead-times and/or (2) the firm incurs higher congestion related costs and/or (3) the penalty for lateness is higher. Further, we study the robustness of optimal profit contributions when the model parameters are mis-estimated.","PeriodicalId":13379,"journal":{"name":"IIE Transactions","volume":"30 1","pages":"151-163"},"PeriodicalIF":0.0000,"publicationDate":"1998-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1080/07408179808966447","citationCount":"185","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IIE Transactions","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/07408179808966447","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 185

Abstract

This research examines the lead-time setting, capacity utilization, and pricing decisions facing a firm serving customers that are sensitive to quoted lead-times. We model the firm's operations as an M/M/1 queue and treat the demand as being linear in price and quoted lead-time. We analyze the quoted lead-time, capacity utilization, and price that maximize revenues less total variable production costs, WIP holding costs, and lateness penalty costs. We use this analysis to show that the capacity utilization should be lower when (1) customers are more sensitive to lead-times and/or (2) the firm incurs higher congestion related costs and/or (3) the penalty for lateness is higher. Further, we study the robustness of optimal profit contributions when the model parameters are mis-estimated.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在交货期相关需求下的交货期设定、产能利用率和定价决策
本研究考察了交货时间设置,产能利用率和定价决策面临的公司服务的客户是敏感的报价交货时间。我们将公司的运营建模为M/M/1队列,并将需求视为价格和报价交货时间的线性关系。我们分析报价的交货期、产能利用率和价格,使收入最大化,减少总可变生产成本、在制品持有成本和延迟惩罚成本。我们使用这一分析来表明,当(1)客户对交货时间更敏感和/或(2)公司产生更高的拥堵相关成本和/或(3)迟到的惩罚更高时,产能利用率应该更低。进一步,我们研究了模型参数被错误估计时最优利润贡献的鲁棒性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
IIE Transactions
IIE Transactions 工程技术-工程:工业
自引率
0.00%
发文量
0
审稿时长
4.5 months
期刊最新文献
EOV Focus Area Editorial Boards Strategic health workforce planning Efficient computation of the likelihood expansions for diffusion models An introduction to optimal power flow: Theory, formulation, and examples An integrated failure mode and effect analysis approach for accurate risk assessment under uncertainty
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1