A precedence constrained flow shop scheduling problem with transportation time, breakdown times, and weighted jobs

IF 1.3 Q4 ENGINEERING, INDUSTRIAL Journal of Project Management Pub Date : 2022-01-01 DOI:10.5267/j.jpm.2022.4.002
M. Thangaraj, T. J. Kumar, K. Nandan
{"title":"A precedence constrained flow shop scheduling problem with transportation time, breakdown times, and weighted jobs","authors":"M. Thangaraj, T. J. Kumar, K. Nandan","doi":"10.5267/j.jpm.2022.4.002","DOIUrl":null,"url":null,"abstract":"Job precedence can often be seen in various manufacturing process scenarios. For instance, in the context of flow shop scheduling, certain jobs must be processed before a specific job may be executed. Formally, this scenario is known as precedence constraint, which influences the optimal job sequence. Because of this practical significance, in this study, a two-machine flow shop scheduling problem in which transportation times, breakdown time, and weighted jobs are considered. In addition to that, an ordered precedence constraint is considered that ensures a successor job cannot start on any machine before its predecessor job has been done on all machines. This is the first study that deals with flow shop scheduling problems with transportation times, breakdown time, job weights, and precedence constraints altogether, to the best of the author’s knowledge. To solve this problem, a simple and efficient solution methodology is developed that assures optimal or near-optimal solutions effectively. The developed algorithm is tested on various test instances and results are reported, which will be useful for future comparative studies.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":null,"pages":null},"PeriodicalIF":1.3000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5267/j.jpm.2022.4.002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 2

Abstract

Job precedence can often be seen in various manufacturing process scenarios. For instance, in the context of flow shop scheduling, certain jobs must be processed before a specific job may be executed. Formally, this scenario is known as precedence constraint, which influences the optimal job sequence. Because of this practical significance, in this study, a two-machine flow shop scheduling problem in which transportation times, breakdown time, and weighted jobs are considered. In addition to that, an ordered precedence constraint is considered that ensures a successor job cannot start on any machine before its predecessor job has been done on all machines. This is the first study that deals with flow shop scheduling problems with transportation times, breakdown time, job weights, and precedence constraints altogether, to the best of the author’s knowledge. To solve this problem, a simple and efficient solution methodology is developed that assures optimal or near-optimal solutions effectively. The developed algorithm is tested on various test instances and results are reported, which will be useful for future comparative studies.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
一个具有运输时间、故障时间和加权作业的优先约束流车间调度问题
作业优先级通常可以在各种制造过程场景中看到。例如,在流程车间调度的上下文中,在执行特定作业之前,必须先处理某些作业。正式地说,这种情况被称为优先约束,它影响最优作业序列。鉴于这一现实意义,本文研究了考虑运输时间、故障时间和加权作业的双机流车间调度问题。除此之外,还考虑了一个有序的优先级约束,以确保后继作业不能在所有机器上完成其前导作业之前在任何机器上启动。据作者所知,这是第一个涉及运输时间、故障时间、工作权重和优先级约束的流程车间调度问题的研究。为了解决这个问题,开发了一种简单有效的求解方法,以确保有效地获得最优或接近最优的解。该算法在多个测试实例上进行了测试,并给出了结果报告,为今后的比较研究提供了参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
3.70
自引率
5.90%
发文量
16
审稿时长
16 weeks
期刊最新文献
Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times Review of sustainable concrete based on photocatalytic to reduce the environmental impact in large works in Peru Development of a robust multi-objective model for green capacitated location-routing under crisis conditions The effect of tourism village development project on economic sustainability through tourism villages based on natural and cultural potentials Structural equation modeling of critical success factors in the programs of development regional
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1