Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of "Podbracan"

Q3 Earth and Planetary Sciences Rem-Revista Escola De Minas Pub Date : 2015-09-01 DOI:10.1590/0370-44672014680100
A. Milutinović, Aleksandar Ganić, Thamer Rayes Diyab, R. Tokalić, Meri Ganić
{"title":"Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of \"Podbracan\"","authors":"A. Milutinović, Aleksandar Ganić, Thamer Rayes Diyab, R. Tokalić, Meri Ganić","doi":"10.1590/0370-44672014680100","DOIUrl":null,"url":null,"abstract":"Mining projects for mineral resource mining contain in certain cases specific technical and technological solutions, these being the result of the mine’s characteristic spatial position and the geometry of the ore deposit, existing mining works, structures, and terrain relief etc. For the purpose of completion of the mining project, it is necessary to carry out a series of mining and surveying tasks during the pre-project and project stage of mining, as well as during the construction of mining facilities and excavation of mineral resources. Specific features of the project concerning excavation of the remaining reserves of bauxite in the deposit of \"Podbracan\", and in this way the forthcoming mining and surveying works, are displayed by the integration of the underground mining project into the existing mine chambers, infrastructure structures on the terrain surface and into the open pit. Large number of mining and surveying works will follow the completion of this project, but in the meantime, this paper shows the a priory accuracy assessment of the spatial position of the point, it being the exit point to the existing bench of the open pit at the elevation +420m.","PeriodicalId":54498,"journal":{"name":"Rem-Revista Escola De Minas","volume":"1 1","pages":"323-330"},"PeriodicalIF":0.0000,"publicationDate":"2015-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Rem-Revista Escola De Minas","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1590/0370-44672014680100","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 1

Abstract

Mining projects for mineral resource mining contain in certain cases specific technical and technological solutions, these being the result of the mine’s characteristic spatial position and the geometry of the ore deposit, existing mining works, structures, and terrain relief etc. For the purpose of completion of the mining project, it is necessary to carry out a series of mining and surveying tasks during the pre-project and project stage of mining, as well as during the construction of mining facilities and excavation of mineral resources. Specific features of the project concerning excavation of the remaining reserves of bauxite in the deposit of "Podbracan", and in this way the forthcoming mining and surveying works, are displayed by the integration of the underground mining project into the existing mine chambers, infrastructure structures on the terrain surface and into the open pit. Large number of mining and surveying works will follow the completion of this project, but in the meantime, this paper shows the a priory accuracy assessment of the spatial position of the point, it being the exit point to the existing bench of the open pit at the elevation +420m.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
为挖掘“Podbracan”铝土矿剩余储量而进行的矿山测量工程
矿产资源开采的采矿项目在某些情况下包含具体的技术和工艺解决方案,这些是矿山的特征空间位置和矿床的几何形状、现有采矿工程、结构和地形起伏等的结果。为了完成采矿项目,在采矿的项目前期和项目阶段,以及在采矿设施的建设和矿产资源的挖掘过程中,都需要进行一系列的采矿和测量任务。“Podbracan”矿床铝土矿剩余储量挖掘项目的具体特点,以及即将进行的采矿和测量工作,通过将地下采矿项目整合到现有的矿室、地形表面的基础设施结构和露天矿中来展示。该项目完成后,将进行大量的采矿和测量工作,同时,本文对该点的空间位置进行了先验精度评估,该点是高程+420m露天矿现有台阶的出口点。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Rem-Revista Escola De Minas
Rem-Revista Escola De Minas 工程技术-工程:土木
自引率
0.00%
发文量
0
审稿时长
6-12 weeks
期刊介绍: REM – International Engineering Journal (antigua REM – Revista Escola de Minas) es la primera revista técnica de Sudamérica. Fue fundada en enero de 1936 por los estudiantes de la Escuela de Minas de Ouro Preto y desde entonces se ha especializado en la publicación de artículos en las áreas de la Ingeniería Civil, Geología, Metalurgia y Materiales y, Minería y Mecánica y Energía. Su objetivo es servir como un medio de publicación para los trabajos técnicos y científicos originales de investigadores nacionales y extranjeros en esas áreas. Contribuciones originales (artículos y cartas) son aceptadas. Artículos de revisión dependen de la invitación y/o análisis de los Editores. El envío de artículos para su publicación implica que el trabajo no ha sido publicado previamente, que no está siendo presentado para su publicación en otra revista y no se publicará en otro lugar, en la misma forma, sin el permiso, por escrito, de los Editores/Autores.
期刊最新文献
Slope stability analysis at highway BR-153 using numerical models Analisys of hot deformation behavior of super duplex stainless steel UNS S32760 through processing maps Modelling and Simulation of the Santa Rita Mine Milling Circuit Dispersion degree and zeta potential of hematite Performance analysis of the HRCTM HPGR in pilot plant
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1