Study of Feasibility Planning Micro Hydro Power Plant in Kampung Mului, Paser

Rizky Monica Virgine, R. Setiabudy
{"title":"Study of Feasibility Planning Micro Hydro Power Plant in Kampung Mului, Paser","authors":"Rizky Monica Virgine, R. Setiabudy","doi":"10.1109/ICHVEPS47643.2019.9011085","DOIUrl":null,"url":null,"abstract":"Kampung Mului is one of the villages in the area of Paser, East Kalimantan. Kampung Mului has not received electricity from PLN so that people who lived in there use generator set for daily needs. Kampung Mului conditions is a fundamental reason for the empowering potential of a waterfall in Kampung Mului be a source of Micro Hydro Power (MHP). In this study, discussed the feasibility of investing MHP economically use comparative expenses Village MHP Mului 20 years of operation with the public electricity expenses Kampung Mului if not wearing the MHP The results of the research show the potential power of Kampung Mului waterfall is 116.08 kW and electricity needs of Kampung Mului is 19,92 kW. The cost of using Kampung Mului community using a generator set is bigger than the cost of using PLTMH which is Rp 2.791.210.000, if using underground cable and Rp 1.394.110.000, - if using ACSR cable. Based on this, the development of PLTMH Kampung Mului is feasible to be implemented in economic terms. This study can be applied and helps the electricity problem in Kampung Mului.","PeriodicalId":6677,"journal":{"name":"2019 2nd International Conference on High Voltage Engineering and Power Systems (ICHVEPS)","volume":"23 1","pages":"163-168"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 2nd International Conference on High Voltage Engineering and Power Systems (ICHVEPS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICHVEPS47643.2019.9011085","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Kampung Mului is one of the villages in the area of Paser, East Kalimantan. Kampung Mului has not received electricity from PLN so that people who lived in there use generator set for daily needs. Kampung Mului conditions is a fundamental reason for the empowering potential of a waterfall in Kampung Mului be a source of Micro Hydro Power (MHP). In this study, discussed the feasibility of investing MHP economically use comparative expenses Village MHP Mului 20 years of operation with the public electricity expenses Kampung Mului if not wearing the MHP The results of the research show the potential power of Kampung Mului waterfall is 116.08 kW and electricity needs of Kampung Mului is 19,92 kW. The cost of using Kampung Mului community using a generator set is bigger than the cost of using PLTMH which is Rp 2.791.210.000, if using underground cable and Rp 1.394.110.000, - if using ACSR cable. Based on this, the development of PLTMH Kampung Mului is feasible to be implemented in economic terms. This study can be applied and helps the electricity problem in Kampung Mului.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
甘肃甘榜木瑞微型水力发电厂可行性规划研究
Kampung Mului是东加里曼丹Paser地区的一个村庄。甘榜木赖没有从PLN获得电力,因此居住在那里的人们使用发电机组满足日常需求。甘榜木瑞的条件是甘榜木瑞瀑布成为微型水力发电(MHP)来源的一个根本原因。在本研究中,讨论了投资MHP经济使用的可行性比较费用村MHP木瑞20年运行与公共电力费用甘邦木瑞如果不使用MHP,研究结果表明,甘邦木瑞瀑布的潜在功率为116.08 kW,甘邦木瑞的电力需求为19.92 kW。使用Kampung Mului社区使用发电机组的成本大于使用PLTMH的成本,如果使用地下电缆,PLTMH的成本为2.791.21万卢比,如果使用ACSR电缆,PLTMH的成本为1.394.11万卢比。基于此,PLTMH甘榜木瑞的开发在经济上是可行的。该研究可以应用于甘榜木瑞的电力问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A Literature Survey of Optimization Technique of Unit Commitment Implementation in Microgrid Electricity System With Renewable Energy Sources Observation of Partial Discharge Waveform of Electrical Treeing in Epoxy Resin with Filler Implementation of Over Current Relays with Non-Cascade Scheme on Medium Voltage Switchgear as Busbar Protection Study Case in PT PLN (Persero) UIT JBB Optimal Capacitor Placement For IEEE 118 Bus System By Using Genetic Algorithm An active clamped two switch flyback Zeta converter with reduced switch voltage stress
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1