{"title":"Impact Of The Use Of Commercial Off-the-shelf Equipment On The Requirements For Electromagnetic Interference (EMI) Control","authors":"R. Stoner","doi":"10.1109/ISEMC.1992.626159","DOIUrl":null,"url":null,"abstract":"With the continued need to use commercial off-the-shelf equipment, the EM1 impact must be considered. The responsibility of meeting contractual requirements for EM1 standards using commercial equipment usually falls on the contractor. This can have a major cost impact on any program using these EM1 standards. Case histories show omission of specific EM1 requirements caused failures during EM1 testing. This has had a cost impact on these programs.","PeriodicalId":93568,"journal":{"name":"IEEE International Symposium on Electromagnetic Compatibility : [proceedings]. IEEE International Symposium on Electromagnetic Compatibility","volume":"6 1","pages":"518-519"},"PeriodicalIF":0.0000,"publicationDate":"1992-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE International Symposium on Electromagnetic Compatibility : [proceedings]. IEEE International Symposium on Electromagnetic Compatibility","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISEMC.1992.626159","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
With the continued need to use commercial off-the-shelf equipment, the EM1 impact must be considered. The responsibility of meeting contractual requirements for EM1 standards using commercial equipment usually falls on the contractor. This can have a major cost impact on any program using these EM1 standards. Case histories show omission of specific EM1 requirements caused failures during EM1 testing. This has had a cost impact on these programs.