PERHITUNGAN WAKTU BAKU DAN PENENTUAN PRODUKTIVITAS PADA PENGERJAAN PEMBERSIHAN KACA GEDUNG X

Ujang Juwardi, Septian Rahmat Adnan, T. Rachman, M. D. Amperajaya, Nofi Erni, Roesfiansjah Rasjidin, Musfirah Cahya Fajrah
{"title":"PERHITUNGAN WAKTU BAKU DAN PENENTUAN PRODUKTIVITAS PADA PENGERJAAN PEMBERSIHAN KACA GEDUNG X","authors":"Ujang Juwardi, Septian Rahmat Adnan, T. Rachman, M. D. Amperajaya, Nofi Erni, Roesfiansjah Rasjidin, Musfirah Cahya Fajrah","doi":"10.21009/jkem.8.1.8","DOIUrl":null,"url":null,"abstract":"XYZ is a company that provides building maintenance services; one of its services is glass cleaning services. In every work on building maintenance services projects in the form of cleaning the glass of PT. XYZ has not calculated the standard time of work, which affects 45% of the total work exceeding the deadline for the job given and the difficulty of estimating the productivity of the workers. In this study, the standard time and productivity were determined on the glass cleaning work of building X using the stopwatch time study method. The results of the calculations carried out using the stopwatch time study method obtained the optimal normal time at each stage of the work, namely in the preparation of work equipment for 58.55 minutes, on the removal of the gallows 112.82 minutes, on the installation of ropes of 20.41 minutes, on machine checking is 22.29 minutes, glass cleaning is 54.17 minutes, rope disassembly process is 57 minutes, and gondola storage is 55.33 minutes so that the optimal standard time is 380.56 minutes. Calculation results showed that performance rating measurement, excellent skill is B1 +0.11, a good effort is C1 +0.05, good condition is C +0.02, consistency is C +0.01 with a rating factor obtained in normal time is 65.569 minutes, and from the results of the calculation of worker productivity in the work of cleaning the glass of building X was obtained 0.12 units/hour.","PeriodicalId":53345,"journal":{"name":"Jurnal Energi Dan Manufaktur","volume":"35 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-01-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Energi Dan Manufaktur","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21009/jkem.8.1.8","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

XYZ is a company that provides building maintenance services; one of its services is glass cleaning services. In every work on building maintenance services projects in the form of cleaning the glass of PT. XYZ has not calculated the standard time of work, which affects 45% of the total work exceeding the deadline for the job given and the difficulty of estimating the productivity of the workers. In this study, the standard time and productivity were determined on the glass cleaning work of building X using the stopwatch time study method. The results of the calculations carried out using the stopwatch time study method obtained the optimal normal time at each stage of the work, namely in the preparation of work equipment for 58.55 minutes, on the removal of the gallows 112.82 minutes, on the installation of ropes of 20.41 minutes, on machine checking is 22.29 minutes, glass cleaning is 54.17 minutes, rope disassembly process is 57 minutes, and gondola storage is 55.33 minutes so that the optimal standard time is 380.56 minutes. Calculation results showed that performance rating measurement, excellent skill is B1 +0.11, a good effort is C1 +0.05, good condition is C +0.02, consistency is C +0.01 with a rating factor obtained in normal time is 65.569 minutes, and from the results of the calculation of worker productivity in the work of cleaning the glass of building X was obtained 0.12 units/hour.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
计算出X大楼清洁工作的固定时间和生产力
XYZ是一家提供楼宇维修服务的公司;它的服务之一是玻璃清洁服务。在大厦维修服务项目中,以清洗PT. XYZ玻璃的形式进行的每一项工作都没有计算工作的标准时间,这影响了超过规定工作期限的总工作量的45%,并且难以估计工人的生产力。本研究采用秒表时间研究方法,确定了X楼玻璃清洁工作的标准时间和生产率。计算的结果进行了使用秒表时间研究方法获得最优正常时间在每个阶段的工作,即在工作设备的准备58.55分钟,在112.82分钟的木架上,安装20.41分钟的绳索,机器检查22.29分钟,玻璃清洗是54.17分钟,绳子拆卸过程是57分钟,贡多拉存储是55.33分钟,最优标准时间是380.56分钟。计算结果表明,性能等级测量中,优秀的技能为B1 +0.11,良好的努力为C1 +0.05,良好的状态为C +0.02,一致性为C +0.01,在正常时间内得到的等级因子为65.569分钟,从计算结果中得到X楼玻璃清洁工作的工人生产率为0.12个单位/小时。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
13
审稿时长
24 weeks
期刊最新文献
Penggunaan Las Gesek (Friction Welding) Guna Penyambungan Dua Buah Logam Baja Karbon ST 42 pada Pengujian Tarik dan Struktur Mikro untuk Spring Pin pada Mobil STUDI EKSPERIMENTAL NATURAL REFIGERANT DENGAN VARIASI DIAMETER TiT-HEAT EXCHANGER TERHADAP REFRIGERATOR PERFORMANCE Sintesis kapsul mikro poli (urea-formaldehid) berisi minyak biji rami sebagai self-healing coating dengan variasi kecepatan agitasi Analisis Pengaruh Waktu Etsa Terhadap Ukuran Struktur Mikrografi Material Logam dan Paduannya Analisis Audit Energi di Gedung Teknik Elektro Universitas Diponegoro
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1