Key Roles of the Full Life Cycle of the “Internet +” Environmental Public Welfare Projects

Liaoliao Li, Yali Zhang, Guoying Tang, Jun Sun
{"title":"Key Roles of the Full Life Cycle of the “Internet +” Environmental Public Welfare Projects","authors":"Liaoliao Li, Yali Zhang, Guoying Tang, Jun Sun","doi":"10.1109/IEEM50564.2021.9673029","DOIUrl":null,"url":null,"abstract":"Most of the “Internet +” environmental protection public welfare project team members are recruited temporarily, therefore, there are often chaotic roles and unclear responsibilities within the project team. Considering the behavior is the basis for role classification, this research explores the necessary roles in each stage of the project life cycle based on the actual behavior of “Internet +” environmental public welfare project members. We propose a model using grounded theory, which comprises respectively five, four, and three key roles at each stage. Specifically, the project preparation phase includes entrepreneur, liaison, resource investigator, shaper and implementer; the project execution phase includes disturbance handler, implementer, completer-finisher and coordinator; the project closure phase includes leader, completer-finisher and spokesman. The model provides a theoretical basis for practitioners involved in decisions on recruiting and managing of the “Internet +” environmental public welfare project.","PeriodicalId":6818,"journal":{"name":"2021 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":"40 12 1","pages":"885-889"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM50564.2021.9673029","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Most of the “Internet +” environmental protection public welfare project team members are recruited temporarily, therefore, there are often chaotic roles and unclear responsibilities within the project team. Considering the behavior is the basis for role classification, this research explores the necessary roles in each stage of the project life cycle based on the actual behavior of “Internet +” environmental public welfare project members. We propose a model using grounded theory, which comprises respectively five, four, and three key roles at each stage. Specifically, the project preparation phase includes entrepreneur, liaison, resource investigator, shaper and implementer; the project execution phase includes disturbance handler, implementer, completer-finisher and coordinator; the project closure phase includes leader, completer-finisher and spokesman. The model provides a theoretical basis for practitioners involved in decisions on recruiting and managing of the “Internet +” environmental public welfare project.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
“互联网+”环境公益项目全生命周期的关键作用
“互联网+”环保公益项目团队成员大多是临时招募的,因此,项目团队内部经常出现角色混乱、职责不清的情况。考虑到行为是角色分类的基础,本研究结合“互联网+”环境公益项目成员的实际行为,探索项目生命周期各阶段所需要的角色。我们提出了一个基于扎根理论的模型,该模型在每个阶段分别包含五个、四个和三个关键角色。具体而言,项目准备阶段包括企业家、联络人、资源调查员、塑造者和实施者;项目执行阶段包括干扰处理者、实施者、完成者和协调者;项目收尾阶段包括负责人、完成者和发言人。该模型为参与“互联网+”环境公益项目招聘和管理决策的从业者提供了理论依据。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Representing Control Software Functionality as Part of a Modular, Mechatronic Construction Kit Situational Awareness and Flight Approach Phase Event Recognition Based on Psychophysiological Measurements The Robust Optimization Approach for the Community Group Purchase Joint Order Fulfillment and Delivery Problem Application of the Multistage One-shot Decision-making Approach to an IT Project in the Central Bank of Oman A Review on Electric Bus Charging Scheduling from Viewpoints of Vehicle Scheduling
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1