Driving Oil and Gas Well Delivery Performance with Value Creation Events

Dagogo Sopriala Omubo, Adedotun Babatunde Ogunwale
{"title":"Driving Oil and Gas Well Delivery Performance with Value Creation Events","authors":"Dagogo Sopriala Omubo, Adedotun Babatunde Ogunwale","doi":"10.24940/ijird/2023/v12/i3/mar23025","DOIUrl":null,"url":null,"abstract":"Oil and gas well delivery involves the execution of well projects, with attention to safety, design specification, desired well objectives, planned time, and agreed budget. These projects involve drilling, completion, work-over, and decommissioning/restoration (also known as abandonment) activities. \nPerformance, with respect to the oil and gas well delivery process, is the result of comparing the actual versus plan of the above-mentioned indicators. This means, to obtain an accurate performance report, there must be benchmarks, clearly agreed upon, prior to the commencement of well execution. Plan-beating performance is not achieved without a deliberate strategy. One of the major contributors to such is the value derived from discussions about the well project. These discussions occur in what could be termed value-creation events. \nValue creation events are simply discussion sessions organized with the intent to derive value that has the potential to improve well-delivery performance. Attendees are largely the stakeholders in the project, including the facilitator of the event. These value-creation events are classified based on the timing of the event relative to the project execution as pre-execution or post-execution events. \nThis paper discusses various value creation events under these classifications and how they are used to drive well delivery performance, with a focus on the value obtained to aid time and cost reduction and delivery of stated well objectives at the minimum.","PeriodicalId":14101,"journal":{"name":"International journal of innovative research and development","volume":"128 ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-04-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International journal of innovative research and development","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24940/ijird/2023/v12/i3/mar23025","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Oil and gas well delivery involves the execution of well projects, with attention to safety, design specification, desired well objectives, planned time, and agreed budget. These projects involve drilling, completion, work-over, and decommissioning/restoration (also known as abandonment) activities. Performance, with respect to the oil and gas well delivery process, is the result of comparing the actual versus plan of the above-mentioned indicators. This means, to obtain an accurate performance report, there must be benchmarks, clearly agreed upon, prior to the commencement of well execution. Plan-beating performance is not achieved without a deliberate strategy. One of the major contributors to such is the value derived from discussions about the well project. These discussions occur in what could be termed value-creation events. Value creation events are simply discussion sessions organized with the intent to derive value that has the potential to improve well-delivery performance. Attendees are largely the stakeholders in the project, including the facilitator of the event. These value-creation events are classified based on the timing of the event relative to the project execution as pre-execution or post-execution events. This paper discusses various value creation events under these classifications and how they are used to drive well delivery performance, with a focus on the value obtained to aid time and cost reduction and delivery of stated well objectives at the minimum.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
通过价值创造事件推动油气井交付绩效
油气井交付涉及到井项目的执行,需要注意安全、设计规范、期望的井目标、计划的时间和商定的预算。这些项目包括钻井、完井、修井和退役/恢复(也称为废弃)活动。就油气井交付过程而言,绩效是将上述指标的实际情况与计划进行比较的结果。这意味着,为了获得准确的性能报告,在开始执行井之前必须有明确商定的基准。如果没有深思熟虑的策略,就无法实现超越计划的绩效。其中一个主要因素是来自于对油井项目的讨论。这些讨论发生在所谓的价值创造事件中。价值创造活动是简单的讨论会议,目的是获得有可能改善油井交付性能的价值。参与者主要是项目的利益相关者,包括事件的促进者。这些价值创造事件根据事件相对于项目执行的时间划分为预执行事件或后执行事件。本文讨论了这些分类下的各种价值创造事件,以及如何利用它们来推动油井交付绩效,重点关注所获得的价值,以帮助减少时间和成本,并最大限度地实现既定的井目标。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Examination of Awareness among University Students in Compliance with Loan Application Requirements in the Northern Zone of Tanzania Vastness of Teachers' Awareness of Students with Special Needs at St. Pamachius Inclusive Secondary School in Hai District, Tanzania ‘Biblo-Musical’ Approach To Music Therapy, Saul and David: A Case Study Irregular Migration: Factors and Policies That Influence Irregular Migration from Sub-Saharan Africa to the EU Extensiveness of Securing Education for Visually Challenged Pupils Project on Improving Pedagogical Skills among Teachers for Visual Learning in Classrooms at Moivaro and Arusha Primary Schools, Tanzania
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1