{"title":"随机提前期冲击系统的周期巡检策略","authors":"Xiaoliang Ling, Yazhou Zhang, Ping Li","doi":"10.1109/phm-qingdao46334.2019.8942938","DOIUrl":null,"url":null,"abstract":"This paper studies a system exposed to shocks, and the effect of the corresponding shocks may be fatal or accumulated. Assume the spare unit for the system has a random lead-time, we study the periodic inspection policy of this system. We formulate a model for the sake of minimizing the average cost per unit time. We give a numerical example to calculate the optimal inspection time.","PeriodicalId":259179,"journal":{"name":"2019 Prognostics and System Health Management Conference (PHM-Qingdao)","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Periodic Inspection Policies of a System Subject to Shocks with Random Lead-time\",\"authors\":\"Xiaoliang Ling, Yazhou Zhang, Ping Li\",\"doi\":\"10.1109/phm-qingdao46334.2019.8942938\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper studies a system exposed to shocks, and the effect of the corresponding shocks may be fatal or accumulated. Assume the spare unit for the system has a random lead-time, we study the periodic inspection policy of this system. We formulate a model for the sake of minimizing the average cost per unit time. We give a numerical example to calculate the optimal inspection time.\",\"PeriodicalId\":259179,\"journal\":{\"name\":\"2019 Prognostics and System Health Management Conference (PHM-Qingdao)\",\"volume\":\"27 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 Prognostics and System Health Management Conference (PHM-Qingdao)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/phm-qingdao46334.2019.8942938\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 Prognostics and System Health Management Conference (PHM-Qingdao)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/phm-qingdao46334.2019.8942938","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Periodic Inspection Policies of a System Subject to Shocks with Random Lead-time
This paper studies a system exposed to shocks, and the effect of the corresponding shocks may be fatal or accumulated. Assume the spare unit for the system has a random lead-time, we study the periodic inspection policy of this system. We formulate a model for the sake of minimizing the average cost per unit time. We give a numerical example to calculate the optimal inspection time.