Ze Shao, Yang Wang, Xiangzhou Chen, Yan Zhang, Junqin He, Zhiqiang Wang
{"title":"电力通信业务网络风险评估方法","authors":"Ze Shao, Yang Wang, Xiangzhou Chen, Yan Zhang, Junqin He, Zhiqiang Wang","doi":"10.1109/ICNIDC.2016.7974532","DOIUrl":null,"url":null,"abstract":"To improve the power communication network risk assessment techniques, we proposed a network risk assessment method for power business. The method is based on the risk assessment relationship model consisted of communication network and power network. According to the risk caused by different levels business faults in physical link layer, network topology layer and business layer, the model uses probabilistic methods to calculate the loss of business caused by network element fault, and then comes out the network risk for business. The simulation results show that this method is easy to understand, and can be deployed to identify the business weaknesses through the risk assessment results, targeted to enhance link reliability or adjust service deployment, reducing the risk of the network.","PeriodicalId":439987,"journal":{"name":"2016 IEEE International Conference on Network Infrastructure and Digital Content (IC-NIDC)","volume":"56 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"A network risk assessment methodology for power communication business\",\"authors\":\"Ze Shao, Yang Wang, Xiangzhou Chen, Yan Zhang, Junqin He, Zhiqiang Wang\",\"doi\":\"10.1109/ICNIDC.2016.7974532\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"To improve the power communication network risk assessment techniques, we proposed a network risk assessment method for power business. The method is based on the risk assessment relationship model consisted of communication network and power network. According to the risk caused by different levels business faults in physical link layer, network topology layer and business layer, the model uses probabilistic methods to calculate the loss of business caused by network element fault, and then comes out the network risk for business. The simulation results show that this method is easy to understand, and can be deployed to identify the business weaknesses through the risk assessment results, targeted to enhance link reliability or adjust service deployment, reducing the risk of the network.\",\"PeriodicalId\":439987,\"journal\":{\"name\":\"2016 IEEE International Conference on Network Infrastructure and Digital Content (IC-NIDC)\",\"volume\":\"56 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 IEEE International Conference on Network Infrastructure and Digital Content (IC-NIDC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICNIDC.2016.7974532\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE International Conference on Network Infrastructure and Digital Content (IC-NIDC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICNIDC.2016.7974532","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A network risk assessment methodology for power communication business
To improve the power communication network risk assessment techniques, we proposed a network risk assessment method for power business. The method is based on the risk assessment relationship model consisted of communication network and power network. According to the risk caused by different levels business faults in physical link layer, network topology layer and business layer, the model uses probabilistic methods to calculate the loss of business caused by network element fault, and then comes out the network risk for business. The simulation results show that this method is easy to understand, and can be deployed to identify the business weaknesses through the risk assessment results, targeted to enhance link reliability or adjust service deployment, reducing the risk of the network.