多机火电厂最优无功控制

T. Trummal, Guido Andreesen, J. Kilter
{"title":"多机火电厂最优无功控制","authors":"T. Trummal, Guido Andreesen, J. Kilter","doi":"10.1109/EPE51172.2020.9269239","DOIUrl":null,"url":null,"abstract":"This paper presents optimal reactive power control methods for allocating required reactive power between the synchronous units in a multi-machine industrial thermal power plant while minimizing reactive power exchange at the connection point to the transmission network. In the paper, three different methods based on i) equal distribution, ii) proportional distribution, and iii) distribution according to active line losses in connection lines between respective generators and busbars, are proposed. For comparison, analysis and verification of the results actual data from one of the industrial power plants in Estonia is used. The results presented indicate the advantages and disadvantages of these methods considering different limitations, e.g. active and reactive power loading capability of the units, busbar voltages and line loadings, in the plant.","PeriodicalId":177031,"journal":{"name":"2020 21st International Scientific Conference on Electric Power Engineering (EPE)","volume":"52 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Optimal Reactive Power Control in a Multi-Machine Thermal Power Plant\",\"authors\":\"T. Trummal, Guido Andreesen, J. Kilter\",\"doi\":\"10.1109/EPE51172.2020.9269239\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents optimal reactive power control methods for allocating required reactive power between the synchronous units in a multi-machine industrial thermal power plant while minimizing reactive power exchange at the connection point to the transmission network. In the paper, three different methods based on i) equal distribution, ii) proportional distribution, and iii) distribution according to active line losses in connection lines between respective generators and busbars, are proposed. For comparison, analysis and verification of the results actual data from one of the industrial power plants in Estonia is used. The results presented indicate the advantages and disadvantages of these methods considering different limitations, e.g. active and reactive power loading capability of the units, busbar voltages and line loadings, in the plant.\",\"PeriodicalId\":177031,\"journal\":{\"name\":\"2020 21st International Scientific Conference on Electric Power Engineering (EPE)\",\"volume\":\"52 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-10-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 21st International Scientific Conference on Electric Power Engineering (EPE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EPE51172.2020.9269239\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 21st International Scientific Conference on Electric Power Engineering (EPE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPE51172.2020.9269239","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

针对多机火电厂同步机组间的无功功率分配问题,提出了一种无功功率优化控制方法,使输电网接点的无功功率交换量最小化。本文提出了三种不同的方法:1)等分布、2)比例分布和3)按各自发电机和母线之间连接线的有功线损分布。为了比较、分析和验证结果,使用了爱沙尼亚一个工业发电厂的实际数据。结果表明,考虑到机组的有功和无功负荷能力、母线电压和电厂线路负荷等不同的限制条件,这些方法的优缺点。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Optimal Reactive Power Control in a Multi-Machine Thermal Power Plant
This paper presents optimal reactive power control methods for allocating required reactive power between the synchronous units in a multi-machine industrial thermal power plant while minimizing reactive power exchange at the connection point to the transmission network. In the paper, three different methods based on i) equal distribution, ii) proportional distribution, and iii) distribution according to active line losses in connection lines between respective generators and busbars, are proposed. For comparison, analysis and verification of the results actual data from one of the industrial power plants in Estonia is used. The results presented indicate the advantages and disadvantages of these methods considering different limitations, e.g. active and reactive power loading capability of the units, busbar voltages and line loadings, in the plant.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analysis of Three-Phase Delta-Connected Converter for Compensation of Unsymmetrical Loads Electric Power Engineering (EPE) BRNO Turbine Control in Island Operation Optimal Reactive Power Control in a Multi-Machine Thermal Power Plant Demand Responsive Power Flow Controller Providing Resistive Load Perspective Regulation in Cooperation with Small Generation Units
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1