开发和评估人为因素的指导方针,以审查先进的人机界面

J. O'Hara
{"title":"开发和评估人为因素的指导方针,以审查先进的人机界面","authors":"J. O'Hara","doi":"10.1109/HFPP.1992.283400","DOIUrl":null,"url":null,"abstract":"Advanced control rooms for future nuclear power plants are being designed utilizing computer-based technologies. The US Nuclear Regulatory Commission (NRC) reviews the human engineering aspects of such control rooms to ensure that they are designed to good human factors engineering principles and that operator performance and reliability are appropriately supported in order to protect public health and safety. The rationale, general approach, and initial development of an NRC Advanced Control Room Design Review Guidelines are reviewed.<<ETX>>","PeriodicalId":150946,"journal":{"name":"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants","volume":"79 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1992-06-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"The development and evaluation of human factors guidelines for the review of advanced human-system interfaces\",\"authors\":\"J. O'Hara\",\"doi\":\"10.1109/HFPP.1992.283400\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Advanced control rooms for future nuclear power plants are being designed utilizing computer-based technologies. The US Nuclear Regulatory Commission (NRC) reviews the human engineering aspects of such control rooms to ensure that they are designed to good human factors engineering principles and that operator performance and reliability are appropriately supported in order to protect public health and safety. The rationale, general approach, and initial development of an NRC Advanced Control Room Design Review Guidelines are reviewed.<<ETX>>\",\"PeriodicalId\":150946,\"journal\":{\"name\":\"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants\",\"volume\":\"79 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1992-06-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/HFPP.1992.283400\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/HFPP.1992.283400","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

未来核电站的先进控制室正在利用计算机技术进行设计。美国核管理委员会(NRC)审查此类控制室的人类工程方面,以确保其设计符合良好的人为因素工程原则,并适当支持操作员的性能和可靠性,以保护公众健康和安全。回顾了NRC高级控制室设计评审指南的基本原理、一般方法和初步发展
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The development and evaluation of human factors guidelines for the review of advanced human-system interfaces
Advanced control rooms for future nuclear power plants are being designed utilizing computer-based technologies. The US Nuclear Regulatory Commission (NRC) reviews the human engineering aspects of such control rooms to ensure that they are designed to good human factors engineering principles and that operator performance and reliability are appropriately supported in order to protect public health and safety. The rationale, general approach, and initial development of an NRC Advanced Control Room Design Review Guidelines are reviewed.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
When technicians use computer programs: approaches to procedure writing The evaluation of crew factors in aircrew team performance Performance of nuclear power plant or automated system depends on operator's availability Getting the attention of senior management for human factors issues: quantitative survey data Progress of I&C system and control room design in TEPCO nuclear power plants
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1