Amelia Ayu Solicha, Dyah Lidyaningtias, Wahiddin Wahiddin
{"title":"APLIKASI BIM PADA PEMBANGUNAN PROYEK JEMBATAN UMBUL KAJI KABUPATEN MALANG","authors":"Amelia Ayu Solicha, Dyah Lidyaningtias, Wahiddin Wahiddin","doi":"10.55404/jos-mrk.2021.02.03.304-309","DOIUrl":null,"url":null,"abstract":"Technological progress is one of the challenges in the field of civil engineering. BIM (Building Information Modeling) is one example of technological advances that can be used for the implementation of construction projects. The BIM applications used are Infraworks Autodesk, Naviswork Autodesk and Revit Autodesk applications. The application of BIM is centered on the construction of the Umbul Kaji bridge project, Malang Regency. The use of the Infraworks Autodesk application is intended to facilitate the placement of facility buildings by directly placing buildings according to topographic conditions. Furthermore, the Naviswork Autodesk application is used to visualize the scheduling progress according to the plan. Then the Revit Autodesk application is used for 3D modeling to get the construction volume, reinforcement volume and construction project implementation price. Based on the results of planning and calculations, the organizational structure used is a functional organizational structure. Site layout is based on Travelling Distance (TD) and Safety Index (SI), so an alternative 3 placement is chosen with a TD value of 100131 and an SI of 730. The bridge implementation method for erection girder uses the launching gantry method. In the preparation of the schedule with the help of Microsoft Project and Naviswork Autodesk, the project implementation time was 230 days. And with the help of Revit Autodesk, the cost of implementing the Umbul Kaji Bridge project is Rp. 46.591.603.677,-.","PeriodicalId":337938,"journal":{"name":"Jurnal JOS-MRK","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal JOS-MRK","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55404/jos-mrk.2021.02.03.304-309","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

技术进步是土木工程领域面临的挑战之一。BIM(建筑信息模型)是技术进步的一个例子,可以用于建设项目的实施。使用的BIM应用程序是infrworks Autodesk、Naviswork Autodesk和Revit Autodesk应用程序。BIM的应用主要集中在玛琅县Umbul Kaji大桥项目的建设中。使用infrworks Autodesk应用程序的目的是通过根据地形条件直接放置建筑物来促进设施建筑物的放置。此外,Naviswork Autodesk应用程序用于根据计划可视化调度进度。然后利用Revit Autodesk软件进行三维建模,得到施工量、配筋量和施工项目实施价格。根据规划和计算的结果,所使用的组织结构是功能组织结构。场地布局是基于旅行距离(TD)和安全指数(SI),因此选择另一个3放置,TD值为100131,SI值为730。架设梁的桥梁实施方法采用启动龙门法。在编制计划时,借助Microsoft Project和Naviswork Autodesk,项目实施时间为230天。在Revit Autodesk的帮助下,Umbul Kaji大桥项目的实施成本为Rp. 46.591.603.677,-。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
APLIKASI BIM PADA PEMBANGUNAN PROYEK JEMBATAN UMBUL KAJI KABUPATEN MALANG
Technological progress is one of the challenges in the field of civil engineering. BIM (Building Information Modeling) is one example of technological advances that can be used for the implementation of construction projects. The BIM applications used are Infraworks Autodesk, Naviswork Autodesk and Revit Autodesk applications. The application of BIM is centered on the construction of the Umbul Kaji bridge project, Malang Regency. The use of the Infraworks Autodesk application is intended to facilitate the placement of facility buildings by directly placing buildings according to topographic conditions. Furthermore, the Naviswork Autodesk application is used to visualize the scheduling progress according to the plan. Then the Revit Autodesk application is used for 3D modeling to get the construction volume, reinforcement volume and construction project implementation price. Based on the results of planning and calculations, the organizational structure used is a functional organizational structure. Site layout is based on Travelling Distance (TD) and Safety Index (SI), so an alternative 3 placement is chosen with a TD value of 100131 and an SI of 730. The bridge implementation method for erection girder uses the launching gantry method. In the preparation of the schedule with the help of Microsoft Project and Naviswork Autodesk, the project implementation time was 230 days. And with the help of Revit Autodesk, the cost of implementing the Umbul Kaji Bridge project is Rp. 46.591.603.677,-.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
ANALISIS STABILITAS TUBUH BENDUNGAN PADA BENDUNGAN SEMANTOK KABUPATEN NGANJUK PROVINSI JAWA TIMUR ANALISA PERPANJANGAN LANDASAN PACU PADA BANDAR UDARA ABDULRACHMAN SALEH MALANG (STA 2+250 – STA 3+000) EVALUASI DAN PERENCANAAN ULANG SISTEM JARINGAN DRAINASE KECAMATAN KARTOHARJO KOTA MADIUN ANALISA KERUSAKAN JALAN MENGGUNAKAN METODE BINA MARGA PADA JALAN RAYA JERU – JALAN RAYA TUMPANG KABUPATEN MALANG PERENCANAAN ULANG STRUKTUR ATAS DAN RAB GEDUNG KULIAH AKN PUTRA SANG FAJAR
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1