{"title":"考虑资源不足时项目管理中的模糊资源分配","authors":"C. Fu, H. Wang","doi":"10.1109/AFSS.1996.583615","DOIUrl":null,"url":null,"abstract":"This study proposes a fuzzy resource allocation model for project management in which a fuzzy relation on resource needs and a budget limit are described. The model can be solved in the form of crisp linear programming (LP) with /spl alpha/-cut. Despite the delivery routes of the teams, the results can express whether the project has sufficient or insufficient resources resulting from each activity.","PeriodicalId":197019,"journal":{"name":"Soft Computing in Intelligent Systems and Information Processing. Proceedings of the 1996 Asian Fuzzy Systems Symposium","volume":"146 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1996-12-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"21","resultStr":"{\"title\":\"Fuzzy resource allocations in project management when insufficient resources are considered\",\"authors\":\"C. Fu, H. Wang\",\"doi\":\"10.1109/AFSS.1996.583615\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study proposes a fuzzy resource allocation model for project management in which a fuzzy relation on resource needs and a budget limit are described. The model can be solved in the form of crisp linear programming (LP) with /spl alpha/-cut. Despite the delivery routes of the teams, the results can express whether the project has sufficient or insufficient resources resulting from each activity.\",\"PeriodicalId\":197019,\"journal\":{\"name\":\"Soft Computing in Intelligent Systems and Information Processing. Proceedings of the 1996 Asian Fuzzy Systems Symposium\",\"volume\":\"146 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1996-12-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"21\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Soft Computing in Intelligent Systems and Information Processing. Proceedings of the 1996 Asian Fuzzy Systems Symposium\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AFSS.1996.583615\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Soft Computing in Intelligent Systems and Information Processing. Proceedings of the 1996 Asian Fuzzy Systems Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AFSS.1996.583615","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Fuzzy resource allocations in project management when insufficient resources are considered
This study proposes a fuzzy resource allocation model for project management in which a fuzzy relation on resource needs and a budget limit are described. The model can be solved in the form of crisp linear programming (LP) with /spl alpha/-cut. Despite the delivery routes of the teams, the results can express whether the project has sufficient or insufficient resources resulting from each activity.