莫朗海滩路柔韧路面的重新规划——面包球STA 0.0 +000 S/D 5+100

Dimas Aditya Putra, Udi Subagyo, R. Sasongko
{"title":"莫朗海滩路柔韧路面的重新规划——面包球STA 0.0 +000 S/D 5+100","authors":"Dimas Aditya Putra, Udi Subagyo, R. Sasongko","doi":"10.55404/jos-mrk.2021.02.03.244-248","DOIUrl":null,"url":null,"abstract":"The Tulungagung / Blitar / Molang Beach – Bululawang Regency Boundary Road was built on the Boundary of Tulungagung Regency and Kab. Blitar. This road construction project is expected to increase tourism and the local economy. The road was previously planned by a planning consultant with a 5.1 km long, 7 m wide, and 2 m shoulder road where the road network system and secondary collector road function with a total financing of Rp. 99.135.045.000,-. Re-planning is done to make alternative plans and improve the comfort of road users. This thesis discusses pavement planning. The data needed are average daily traffic, CBR land data. The calculation and planning of the road refers to SNI Pt T – 01 – 2002 – B Refers to AASHTO'93. 15.30 cm sub-base layer, 15.30 cm top foundation layer, 10 cm surface layer.","PeriodicalId":337938,"journal":{"name":"Jurnal JOS-MRK","volume":"383 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"PERENCANAAN ULANG PERKERASAN LENTUR JALAN PANTAI MOLANG – BULULAWANG STA 0+000 S/D 5+100\",\"authors\":\"Dimas Aditya Putra, Udi Subagyo, R. Sasongko\",\"doi\":\"10.55404/jos-mrk.2021.02.03.244-248\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Tulungagung / Blitar / Molang Beach – Bululawang Regency Boundary Road was built on the Boundary of Tulungagung Regency and Kab. Blitar. This road construction project is expected to increase tourism and the local economy. The road was previously planned by a planning consultant with a 5.1 km long, 7 m wide, and 2 m shoulder road where the road network system and secondary collector road function with a total financing of Rp. 99.135.045.000,-. Re-planning is done to make alternative plans and improve the comfort of road users. This thesis discusses pavement planning. The data needed are average daily traffic, CBR land data. The calculation and planning of the road refers to SNI Pt T – 01 – 2002 – B Refers to AASHTO'93. 15.30 cm sub-base layer, 15.30 cm top foundation layer, 10 cm surface layer.\",\"PeriodicalId\":337938,\"journal\":{\"name\":\"Jurnal JOS-MRK\",\"volume\":\"383 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal JOS-MRK\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.55404/jos-mrk.2021.02.03.244-248\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal JOS-MRK","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55404/jos-mrk.2021.02.03.244-248","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

图伦加贡/布里达/莫朗海滩-布拉旺摄政边界公路建在图伦加贡摄政和加布的边界上。Blitar。这一道路建设项目有望促进旅游业和当地经济。该道路先前由规划顾问规划为5.1公里长,7米宽,2米肩路,其中道路网络系统和二级收集道路功能,总融资为99.135.045.000卢比,-。重新规划道路,以制定替代方案,并改善道路使用者的舒适度。本文讨论了路面规划。所需数据为日均交通量、CBR土地数据。道路的计算和规划参照SNI Pt T - 01 - 2002 - B参照AASHTO'93。15.30 cm的次基土层,15.30 cm的上基土层,10 cm的表层。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
PERENCANAAN ULANG PERKERASAN LENTUR JALAN PANTAI MOLANG – BULULAWANG STA 0+000 S/D 5+100
The Tulungagung / Blitar / Molang Beach – Bululawang Regency Boundary Road was built on the Boundary of Tulungagung Regency and Kab. Blitar. This road construction project is expected to increase tourism and the local economy. The road was previously planned by a planning consultant with a 5.1 km long, 7 m wide, and 2 m shoulder road where the road network system and secondary collector road function with a total financing of Rp. 99.135.045.000,-. Re-planning is done to make alternative plans and improve the comfort of road users. This thesis discusses pavement planning. The data needed are average daily traffic, CBR land data. The calculation and planning of the road refers to SNI Pt T – 01 – 2002 – B Refers to AASHTO'93. 15.30 cm sub-base layer, 15.30 cm top foundation layer, 10 cm surface layer.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
ANALISIS STABILITAS TUBUH BENDUNGAN PADA BENDUNGAN SEMANTOK KABUPATEN NGANJUK PROVINSI JAWA TIMUR ANALISA PERPANJANGAN LANDASAN PACU PADA BANDAR UDARA ABDULRACHMAN SALEH MALANG (STA 2+250 – STA 3+000) EVALUASI DAN PERENCANAAN ULANG SISTEM JARINGAN DRAINASE KECAMATAN KARTOHARJO KOTA MADIUN ANALISA KERUSAKAN JALAN MENGGUNAKAN METODE BINA MARGA PADA JALAN RAYA JERU – JALAN RAYA TUMPANG KABUPATEN MALANG PERENCANAAN ULANG STRUKTUR ATAS DAN RAB GEDUNG KULIAH AKN PUTRA SANG FAJAR
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1