{"title":"在中等水平的公私伙伴关系中应用应急方法进行项目管理","authors":"M. Shkoda","doi":"10.30857/2413-0117.2019.1.3","DOIUrl":null,"url":null,"abstract":"This paper investigates the application of a contingency approach to managing meso-level public-private partnership projects. It is argued that situational management in implementing public-private partnership projects should rely on the so-called risk-contributing factors. It is emphasized that the contingency approach in the context of public-private partnerships is based on developing a set of indicators and integral index calculation used to rank both the projects themselves and their application in terms of territorial and sectoral aspects. It is proved that the integral coefficient at the meso-level reflects the most favorable environment for doing business, including basic frameworks for realization of public-private partnership projects. According to the calculations carried out within this study, at the regional level by selected indicators, the Mykolayiv region has demonstrated the most favorable conditions. Accordingly, the Donetsk region has the highest level of transaction costs and the highest rate of project implementation risk, i. e. the absolute risk value makes up 0.482. The high risk index for this region stems from military activities, low infrastructure development, lack of sufficient production capacity and, consequently, significant commercial and administrative costs for current operations. Thus, it is concluded that the assessment and multilevel analysis based on integral indicators, absolute and relative risk indicators are sufficient for the optimal selection of public-private partnership projects upon the criterion \"the lowest project implementation risk – the greatest effects in different areas of activity.","PeriodicalId":217561,"journal":{"name":"Bulletin of the Kyiv National University of Technologies and Design. Series: Economic sciences","volume":"25 4","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-06-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"APPLYING A CONTINGENCY APPROACH TO PROJECT MANAGEMENT WITHIN MESO-LEVEL PUBLIC-PRIVATE PARTNERSHIPS\",\"authors\":\"M. Shkoda\",\"doi\":\"10.30857/2413-0117.2019.1.3\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper investigates the application of a contingency approach to managing meso-level public-private partnership projects. It is argued that situational management in implementing public-private partnership projects should rely on the so-called risk-contributing factors. It is emphasized that the contingency approach in the context of public-private partnerships is based on developing a set of indicators and integral index calculation used to rank both the projects themselves and their application in terms of territorial and sectoral aspects. It is proved that the integral coefficient at the meso-level reflects the most favorable environment for doing business, including basic frameworks for realization of public-private partnership projects. According to the calculations carried out within this study, at the regional level by selected indicators, the Mykolayiv region has demonstrated the most favorable conditions. Accordingly, the Donetsk region has the highest level of transaction costs and the highest rate of project implementation risk, i. e. the absolute risk value makes up 0.482. The high risk index for this region stems from military activities, low infrastructure development, lack of sufficient production capacity and, consequently, significant commercial and administrative costs for current operations. Thus, it is concluded that the assessment and multilevel analysis based on integral indicators, absolute and relative risk indicators are sufficient for the optimal selection of public-private partnership projects upon the criterion \\\"the lowest project implementation risk – the greatest effects in different areas of activity.\",\"PeriodicalId\":217561,\"journal\":{\"name\":\"Bulletin of the Kyiv National University of Technologies and Design. Series: Economic sciences\",\"volume\":\"25 4\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-06-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Bulletin of the Kyiv National University of Technologies and Design. Series: Economic sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30857/2413-0117.2019.1.3\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bulletin of the Kyiv National University of Technologies and Design. Series: Economic sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30857/2413-0117.2019.1.3","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文研究了权变方法在中观公私合作项目管理中的应用。本文认为,在公私合作项目实施过程中,情景管理应依赖于所谓的风险因素。强调在公私伙伴关系方面的应急办法的基础是制订一套指标和综合指数计算方法,用于对项目本身及其应用在领土和部门方面进行排名。证明了中观层面的积分系数反映了最有利的营商环境,包括实现公私合作项目的基本框架。根据本研究中所作的计算,在区域一级按选定指标计算,尼古拉耶夫地区的条件最为有利。因此,顿涅茨克地区的交易成本水平最高,项目实施风险率最高,即绝对风险值为0.482。该区域风险指数高的原因是军事活动、基础设施发展程度低、缺乏足够的生产能力,因此目前的业务需要大量的商业和行政费用。因此,基于整体指标、绝对风险指标和相对风险指标的评价和多层次分析足以以“项目实施风险最低-不同活动领域影响最大”为标准进行公私伙伴关系项目的最优选择。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
APPLYING A CONTINGENCY APPROACH TO PROJECT MANAGEMENT WITHIN MESO-LEVEL PUBLIC-PRIVATE PARTNERSHIPS
This paper investigates the application of a contingency approach to managing meso-level public-private partnership projects. It is argued that situational management in implementing public-private partnership projects should rely on the so-called risk-contributing factors. It is emphasized that the contingency approach in the context of public-private partnerships is based on developing a set of indicators and integral index calculation used to rank both the projects themselves and their application in terms of territorial and sectoral aspects. It is proved that the integral coefficient at the meso-level reflects the most favorable environment for doing business, including basic frameworks for realization of public-private partnership projects. According to the calculations carried out within this study, at the regional level by selected indicators, the Mykolayiv region has demonstrated the most favorable conditions. Accordingly, the Donetsk region has the highest level of transaction costs and the highest rate of project implementation risk, i. e. the absolute risk value makes up 0.482. The high risk index for this region stems from military activities, low infrastructure development, lack of sufficient production capacity and, consequently, significant commercial and administrative costs for current operations. Thus, it is concluded that the assessment and multilevel analysis based on integral indicators, absolute and relative risk indicators are sufficient for the optimal selection of public-private partnership projects upon the criterion "the lowest project implementation risk – the greatest effects in different areas of activity.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
АНАЛІЗ МІЖНАРОДНОГО ДОСВІДУ ПЕРЕДАЧІ ІННОВАЦІЙНИХ ТЕХНОЛОГІЙ ВІД УНІВЕРСИТЕТІВ ДО ПІДПРИЄМНИЦЬКОГО СЕРЕДОВИЩА ІНТЕРНЕТ-МАРКЕТИНГ ЯК КОМПОНЕНТА ТУРИСТИЧНОГО БІЗНЕСУ В РОЗУМНІЙ ЕКОНОМІЦІ ТЕОРЕТИКО-МЕТОДИЧНИЙ КОНЦЕПТ МОДИФІКУВАННЯ ДЕКОМПОЗИЦІЙНОЇ СТРУКТУРИ ПРОЦЕСУ УПРАВЛІННЯ ЛОГІСТИЧНИМ ЗАБЕЗПЕЧЕННЯМ РОЗВИТКУ ІННОВАЦІЙНОГО СПІВРОБІТНИЦТВА В УМОВАХ ЦИРКУЛЯРНОЇ ЕКОНОМІКИ ІNFORMATION SUPPORT FOR TOURISM AND HOTEL BUSINESS DEVELOPMENT ТЕОРЕТИЧНА ІНТЕРПРЕТАЦІЯ ВАРІАТИВНОСТІ ФОРМУВАННЯ СОЦІАЛЬНОЇ ВІДПОВІДАЛЬНОСТІ ЗАКЛАДІВ ВИЩОЇ ОСВІТИ
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1