{"title":"泄流结构下游局部冲刷孔形状及深度的试验研究","authors":"Vouchleang Hong, Genguang Zhang, Xinqiang Wang, Anbin Li","doi":"10.4236/wjet.2020.81010","DOIUrl":null,"url":null,"abstract":"Local scour downstream of the release structure is a critical problem to the safe and stable operation of water resources and hydropower engineering. In order to investigate the shape and depth of the scour hole under the equilibrium state of erosion and deposition downstream of an apron, a group of 16 experiments from the hydraulic similarity model test of Dangka Hydropower Station was conducted with the non-cohesive sediment of different median particle sizes under different flow rates in this study. The control variable method was to study the influence of the flow rate and sediment size on the shape of the scour hole to define the number of experiment times of each test group. The results showed that the plane shape of the scour hole was irregular ellipse or semi-ellipse. The depth and size of the scour hole increased with the increase of the flow rate, and decreased with the increase of the sediment size; the downstream longitudinal slope ratio of the scour hole increased with the increase of the sediment size. The coefficients of the upstream and downstream slope ratio of the local scour hole were 1/2 to 1/6 and about 1/10, respectively.","PeriodicalId":344331,"journal":{"name":"World Journal of Engineering and Technology","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-02-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Experimental Investigation on the Shape and Depth of Local Scour Hole Downstream of the Release Structure\",\"authors\":\"Vouchleang Hong, Genguang Zhang, Xinqiang Wang, Anbin Li\",\"doi\":\"10.4236/wjet.2020.81010\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Local scour downstream of the release structure is a critical problem to the safe and stable operation of water resources and hydropower engineering. In order to investigate the shape and depth of the scour hole under the equilibrium state of erosion and deposition downstream of an apron, a group of 16 experiments from the hydraulic similarity model test of Dangka Hydropower Station was conducted with the non-cohesive sediment of different median particle sizes under different flow rates in this study. The control variable method was to study the influence of the flow rate and sediment size on the shape of the scour hole to define the number of experiment times of each test group. The results showed that the plane shape of the scour hole was irregular ellipse or semi-ellipse. The depth and size of the scour hole increased with the increase of the flow rate, and decreased with the increase of the sediment size; the downstream longitudinal slope ratio of the scour hole increased with the increase of the sediment size. The coefficients of the upstream and downstream slope ratio of the local scour hole were 1/2 to 1/6 and about 1/10, respectively.\",\"PeriodicalId\":344331,\"journal\":{\"name\":\"World Journal of Engineering and Technology\",\"volume\":\"18 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-02-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"World Journal of Engineering and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4236/wjet.2020.81010\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"World Journal of Engineering and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4236/wjet.2020.81010","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

泄流结构下游局部冲刷是影响水利水电工程安全稳定运行的关键问题。为了研究停机坪下游冲淤平衡状态下冲刷孔的形态和深度,本研究以不同流速下不同中位粒径的非粘性泥沙为研究对象,进行了党卡水电站水力相似模型试验中的16组试验。控制变量法是研究流速和泥沙粒径对冲刷孔形状的影响,以确定各试验组的实验次数。结果表明:冲刷孔的平面形状为不规则椭圆或半椭圆;冲刷孔的深度和大小随流量的增大而增大,随泥沙粒径的增大而减小;冲刷孔下游纵向坡度比随着泥沙粒径的增大而增大。局部冲刷孔上游坡比系数为1/2 ~ 1/6,下游坡比系数约为1/10。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Experimental Investigation on the Shape and Depth of Local Scour Hole Downstream of the Release Structure
Local scour downstream of the release structure is a critical problem to the safe and stable operation of water resources and hydropower engineering. In order to investigate the shape and depth of the scour hole under the equilibrium state of erosion and deposition downstream of an apron, a group of 16 experiments from the hydraulic similarity model test of Dangka Hydropower Station was conducted with the non-cohesive sediment of different median particle sizes under different flow rates in this study. The control variable method was to study the influence of the flow rate and sediment size on the shape of the scour hole to define the number of experiment times of each test group. The results showed that the plane shape of the scour hole was irregular ellipse or semi-ellipse. The depth and size of the scour hole increased with the increase of the flow rate, and decreased with the increase of the sediment size; the downstream longitudinal slope ratio of the scour hole increased with the increase of the sediment size. The coefficients of the upstream and downstream slope ratio of the local scour hole were 1/2 to 1/6 and about 1/10, respectively.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Research on Influencing Factors of Reservoir Construction Risk Based on Interpretative Structural Modeling Preliminary Exploration on the Application of Saussure Sign Concept in Bio-Inspired Design: A Case of Tiantoushui Doll-Design Comparative Analysis of Hybrid Controllers of Done Systems (UPFC) and Interphase Power Regulators Type RPI 30p15 on Contingency Management in Electrical Networks Bureaucratic Factors Impeding the Delivery of Infrastructure at the Metropolitan Municipal and District Assemblies (MMDAs) in Ghana Summary of Application of Fuzzy Mathematics in Construction Project Management
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1