粒子群优化算法在最大完工时间、总流程时间和完工时间方差最小的置换流水车间调度问题中的应用

S. Chandrasekaran, R. Suresh, S. Ponnambalam, N. Vijayakumar
{"title":"粒子群优化算法在最大完工时间、总流程时间和完工时间方差最小的置换流水车间调度问题中的应用","authors":"S. Chandrasekaran, R. Suresh, S. Ponnambalam, N. Vijayakumar","doi":"10.1109/COASE.2006.326934","DOIUrl":null,"url":null,"abstract":"The problem of scheduling in flowshops with the objective of minimizing makespan, total flowtime and completion time variation is studied in this paper. A simple discrete version of particle swarm optimization algorithm (PSO) is proposed for solving the set of benchmark flowshop scheduling problems proposed by Taillard (1993). The obtained results are better when compared with the results published in the literature.","PeriodicalId":116108,"journal":{"name":"2006 IEEE International Conference on Automation Science and Engineering","volume":"56 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"An Application of Particle Swarm Optimization Algorithm to Permutation Flowshop Scheduling Problems to Minimize Makespan, Total Flowtime and Completion Time Variance\",\"authors\":\"S. Chandrasekaran, R. Suresh, S. Ponnambalam, N. Vijayakumar\",\"doi\":\"10.1109/COASE.2006.326934\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The problem of scheduling in flowshops with the objective of minimizing makespan, total flowtime and completion time variation is studied in this paper. A simple discrete version of particle swarm optimization algorithm (PSO) is proposed for solving the set of benchmark flowshop scheduling problems proposed by Taillard (1993). The obtained results are better when compared with the results published in the literature.\",\"PeriodicalId\":116108,\"journal\":{\"name\":\"2006 IEEE International Conference on Automation Science and Engineering\",\"volume\":\"56 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2006 IEEE International Conference on Automation Science and Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/COASE.2006.326934\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 IEEE International Conference on Automation Science and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/COASE.2006.326934","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

研究了以最大完工时间、总流程时间和完工时间变化最小为目标的流水车间调度问题。针对Taillard(1993)提出的一组基准流水车间调度问题,提出了一种简单的离散粒子群优化算法(PSO)。所得结果与已发表的文献结果进行了比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
An Application of Particle Swarm Optimization Algorithm to Permutation Flowshop Scheduling Problems to Minimize Makespan, Total Flowtime and Completion Time Variance
The problem of scheduling in flowshops with the objective of minimizing makespan, total flowtime and completion time variation is studied in this paper. A simple discrete version of particle swarm optimization algorithm (PSO) is proposed for solving the set of benchmark flowshop scheduling problems proposed by Taillard (1993). The obtained results are better when compared with the results published in the literature.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Multi-Period Production Capacity Planning for Integrated Product and Production System Design Introduction to Automated Material Handling Systems in LCD Panel Production Lines Heuristic Methods to Solve the Alternative Subgraphs Assembly Line Balancing Problem Research of Multi-operation Quality Control based on Minimum Quality Loss Distribution network design with random demand and unreliable suppliers
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1