{"title":"自动化装配批交易","authors":"M. Tiong, Thiruselvam, R. Tugay","doi":"10.1109/IEMT.2012.6521772","DOIUrl":null,"url":null,"abstract":"The need to track every lot before and after each process or step into the system is an unavoidable task as this is how the lot is tracked for its location, timeliness and status. In general, the data entry to the system or paperwork may consist of multiple steps and sequence, this would definately contribute and occupy precious production time. This calls for an automated lot transaction system to regain the time wasted and redeploy operator's valuable time to other value added activities.","PeriodicalId":315408,"journal":{"name":"2012 35th IEEE/CPMT International Electronics Manufacturing Technology Conference (IEMT)","volume":"67 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Automated assembly lot transaction\",\"authors\":\"M. Tiong, Thiruselvam, R. Tugay\",\"doi\":\"10.1109/IEMT.2012.6521772\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The need to track every lot before and after each process or step into the system is an unavoidable task as this is how the lot is tracked for its location, timeliness and status. In general, the data entry to the system or paperwork may consist of multiple steps and sequence, this would definately contribute and occupy precious production time. This calls for an automated lot transaction system to regain the time wasted and redeploy operator's valuable time to other value added activities.\",\"PeriodicalId\":315408,\"journal\":{\"name\":\"2012 35th IEEE/CPMT International Electronics Manufacturing Technology Conference (IEMT)\",\"volume\":\"67 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 35th IEEE/CPMT International Electronics Manufacturing Technology Conference (IEMT)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEMT.2012.6521772\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 35th IEEE/CPMT International Electronics Manufacturing Technology Conference (IEMT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEMT.2012.6521772","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The need to track every lot before and after each process or step into the system is an unavoidable task as this is how the lot is tracked for its location, timeliness and status. In general, the data entry to the system or paperwork may consist of multiple steps and sequence, this would definately contribute and occupy precious production time. This calls for an automated lot transaction system to regain the time wasted and redeploy operator's valuable time to other value added activities.