{"title":"系统和设备接地的复杂性","authors":"R. Ganesan, S.K. Das","doi":"10.1109/ICEMIC.1999.871673","DOIUrl":null,"url":null,"abstract":"This paper describes the basic concepts of 'grounding' in the context of meeting both safety and EMC performance requirements. It analyzes various sub-systems of the 'grounding system' and recommends proper 'system' and 'facility' grounding practices. It also covers a case study of a 'facility' grounding.","PeriodicalId":104361,"journal":{"name":"Proceedings of the International Conference on Electromagnetic Interference and Compatibility","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Intricacy in system and facility grounding\",\"authors\":\"R. Ganesan, S.K. Das\",\"doi\":\"10.1109/ICEMIC.1999.871673\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper describes the basic concepts of 'grounding' in the context of meeting both safety and EMC performance requirements. It analyzes various sub-systems of the 'grounding system' and recommends proper 'system' and 'facility' grounding practices. It also covers a case study of a 'facility' grounding.\",\"PeriodicalId\":104361,\"journal\":{\"name\":\"Proceedings of the International Conference on Electromagnetic Interference and Compatibility\",\"volume\":\"26 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the International Conference on Electromagnetic Interference and Compatibility\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICEMIC.1999.871673\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the International Conference on Electromagnetic Interference and Compatibility","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICEMIC.1999.871673","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
This paper describes the basic concepts of 'grounding' in the context of meeting both safety and EMC performance requirements. It analyzes various sub-systems of the 'grounding system' and recommends proper 'system' and 'facility' grounding practices. It also covers a case study of a 'facility' grounding.