与双馈风力发电机组相结合的无功市场经济分析

Aditi Gupta, Y. P. Verma, A. Chauhan
{"title":"与双馈风力发电机组相结合的无功市场经济分析","authors":"Aditi Gupta, Y. P. Verma, A. Chauhan","doi":"10.1109/ICSCCC.2018.8703281","DOIUrl":null,"url":null,"abstract":"In this article, economic impact of reactive power services in pool based deregulated power market integrated with wind units is analyzed. Reactive power cost of different generators including fixed speed wind units and doubly fed induction generator based variable speed wind units is calculated using the concept of loss of real power spinning reserve cost by using loading capability curve. The proposed optimization model is validated and implemented on a modified 5-bus test system and is then extended to a larger IEEE 24-bus RTS system using GAMS 23.4 software in interfacing with MATLAB 7.0. Results reveal better financial and technical performance of DFIG based wind farms as compared to fixed speed wind farms in reactive power management.","PeriodicalId":148491,"journal":{"name":"2018 First International Conference on Secure Cyber Computing and Communication (ICSCCC)","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Economic Analysis of Reactive Power Services in Deregulated Power Market Integrated with Doubly Fed Induction Generator Wind Unit\",\"authors\":\"Aditi Gupta, Y. P. Verma, A. Chauhan\",\"doi\":\"10.1109/ICSCCC.2018.8703281\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this article, economic impact of reactive power services in pool based deregulated power market integrated with wind units is analyzed. Reactive power cost of different generators including fixed speed wind units and doubly fed induction generator based variable speed wind units is calculated using the concept of loss of real power spinning reserve cost by using loading capability curve. The proposed optimization model is validated and implemented on a modified 5-bus test system and is then extended to a larger IEEE 24-bus RTS system using GAMS 23.4 software in interfacing with MATLAB 7.0. Results reveal better financial and technical performance of DFIG based wind farms as compared to fixed speed wind farms in reactive power management.\",\"PeriodicalId\":148491,\"journal\":{\"name\":\"2018 First International Conference on Secure Cyber Computing and Communication (ICSCCC)\",\"volume\":\"21 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 First International Conference on Secure Cyber Computing and Communication (ICSCCC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICSCCC.2018.8703281\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 First International Conference on Secure Cyber Computing and Communication (ICSCCC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSCCC.2018.8703281","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文分析了无功服务在与风电机组相结合的池式解除管制电力市场中的经济影响。利用负荷能力曲线,利用实际功率旋转备用成本损失的概念,计算了固定转速风电机组和基于双馈感应发电机的变速风电机组的无功成本。该优化模型在改进的5总线测试系统上进行了验证和实现,然后使用GAMS 23.4软件与MATLAB 7.0接口将其扩展到更大的IEEE 24总线RTS系统。结果表明,与固定速度风电场相比,基于DFIG的风电场在无功管理方面具有更好的财务和技术性能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Economic Analysis of Reactive Power Services in Deregulated Power Market Integrated with Doubly Fed Induction Generator Wind Unit
In this article, economic impact of reactive power services in pool based deregulated power market integrated with wind units is analyzed. Reactive power cost of different generators including fixed speed wind units and doubly fed induction generator based variable speed wind units is calculated using the concept of loss of real power spinning reserve cost by using loading capability curve. The proposed optimization model is validated and implemented on a modified 5-bus test system and is then extended to a larger IEEE 24-bus RTS system using GAMS 23.4 software in interfacing with MATLAB 7.0. Results reveal better financial and technical performance of DFIG based wind farms as compared to fixed speed wind farms in reactive power management.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
To Alleviate The Flooding Attack and Intensify Efficiency in MANET Deep Leaming Approaches for Brain Tumor Segmentation: A Review Q-AODV: A Flood control Ad-Hoc on Demand Distance Vector Routing Protocol Sentimental Analysis On Social Feeds to Predict the Elections A Comparative study of various Video Tampering detection methods
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1