自主流入控制装置在水平井和分支井中的综合应用与运行评价方法

T. Solovyev
{"title":"自主流入控制装置在水平井和分支井中的综合应用与运行评价方法","authors":"T. Solovyev","doi":"10.3997/2214-4609.202154032","DOIUrl":null,"url":null,"abstract":"Summary The article also describes general information about the inflow control devices technology, their characteristics and problems that the operators user may encounter when using one or another element of high-tech completion, gives reasons for the use of autonomous inflow control devices at the considered development object. Analysis of field data and PLT and well logs results revealed that the devices actually work and help to limit water and gas compared to wells that are equipped only with wire filters without inflow control, and also begin to form a unified strategy and concept of well completion based on the data The results of the work show that currently the use of AFCD for the project is favorable, and the completion of wells without flow control in these conditions is impractical.","PeriodicalId":105144,"journal":{"name":"Horizontal Wells 2021","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"An Integrated Approach for Application and Operation evaluation of Autonomous Inflow Control Devices in Horizontal and Multilateral wells\",\"authors\":\"T. Solovyev\",\"doi\":\"10.3997/2214-4609.202154032\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Summary The article also describes general information about the inflow control devices technology, their characteristics and problems that the operators user may encounter when using one or another element of high-tech completion, gives reasons for the use of autonomous inflow control devices at the considered development object. Analysis of field data and PLT and well logs results revealed that the devices actually work and help to limit water and gas compared to wells that are equipped only with wire filters without inflow control, and also begin to form a unified strategy and concept of well completion based on the data The results of the work show that currently the use of AFCD for the project is favorable, and the completion of wells without flow control in these conditions is impractical.\",\"PeriodicalId\":105144,\"journal\":{\"name\":\"Horizontal Wells 2021\",\"volume\":\"46 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-05-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Horizontal Wells 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3997/2214-4609.202154032\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Horizontal Wells 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3997/2214-4609.202154032","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文还介绍了流入控制装置技术的一般信息,它们的特点以及操作人员在使用高科技完井元件时可能遇到的问题,并给出了在考虑的开发对象上使用自主流入控制装置的原因。分析现场数据和PLT测井结果表明设备实际工作和帮助限制水和天然气井相比,只装备线过滤器没有流入控制,并开始形成一个统一的策略和概念基于数据的完井工作的结果表明,目前使用的渔护署项目优惠,和完成井没有流控制在这些条件是不切实际的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
An Integrated Approach for Application and Operation evaluation of Autonomous Inflow Control Devices in Horizontal and Multilateral wells
Summary The article also describes general information about the inflow control devices technology, their characteristics and problems that the operators user may encounter when using one or another element of high-tech completion, gives reasons for the use of autonomous inflow control devices at the considered development object. Analysis of field data and PLT and well logs results revealed that the devices actually work and help to limit water and gas compared to wells that are equipped only with wire filters without inflow control, and also begin to form a unified strategy and concept of well completion based on the data The results of the work show that currently the use of AFCD for the project is favorable, and the completion of wells without flow control in these conditions is impractical.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The approach for anomalous permeable zones detection in the sedimentary cover based on geomorphological analysis and gravimetric data [1] Podhody`, idei i resheniia, kotory`e pozvoliaiut provodit` geonavigatciiu bolee 3000 gorizontal`ny`kh stvolov v god The importance of pinpoint horizontal well landing Analiz aktivnosti razry`vny`kh narushenii` dlia snizheniia riskov pogloshcheniia pri burenii gorizontal`ny`kh skvazhin Geochemical Approach for Identification of Hydraulic Fracture Vertical Distribution in Reservoir Simulation Model Basing on Microcomponent Study of Oil Produced
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1