{"title":"自主流入控制装置在水平井和分支井中的综合应用与运行评价方法","authors":"T. Solovyev","doi":"10.3997/2214-4609.202154032","DOIUrl":null,"url":null,"abstract":"Summary The article also describes general information about the inflow control devices technology, their characteristics and problems that the operators user may encounter when using one or another element of high-tech completion, gives reasons for the use of autonomous inflow control devices at the considered development object. Analysis of field data and PLT and well logs results revealed that the devices actually work and help to limit water and gas compared to wells that are equipped only with wire filters without inflow control, and also begin to form a unified strategy and concept of well completion based on the data The results of the work show that currently the use of AFCD for the project is favorable, and the completion of wells without flow control in these conditions is impractical.","PeriodicalId":105144,"journal":{"name":"Horizontal Wells 2021","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"An Integrated Approach for Application and Operation evaluation of Autonomous Inflow Control Devices in Horizontal and Multilateral wells\",\"authors\":\"T. Solovyev\",\"doi\":\"10.3997/2214-4609.202154032\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Summary The article also describes general information about the inflow control devices technology, their characteristics and problems that the operators user may encounter when using one or another element of high-tech completion, gives reasons for the use of autonomous inflow control devices at the considered development object. Analysis of field data and PLT and well logs results revealed that the devices actually work and help to limit water and gas compared to wells that are equipped only with wire filters without inflow control, and also begin to form a unified strategy and concept of well completion based on the data The results of the work show that currently the use of AFCD for the project is favorable, and the completion of wells without flow control in these conditions is impractical.\",\"PeriodicalId\":105144,\"journal\":{\"name\":\"Horizontal Wells 2021\",\"volume\":\"46 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-05-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Horizontal Wells 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3997/2214-4609.202154032\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Horizontal Wells 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3997/2214-4609.202154032","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
An Integrated Approach for Application and Operation evaluation of Autonomous Inflow Control Devices in Horizontal and Multilateral wells
Summary The article also describes general information about the inflow control devices technology, their characteristics and problems that the operators user may encounter when using one or another element of high-tech completion, gives reasons for the use of autonomous inflow control devices at the considered development object. Analysis of field data and PLT and well logs results revealed that the devices actually work and help to limit water and gas compared to wells that are equipped only with wire filters without inflow control, and also begin to form a unified strategy and concept of well completion based on the data The results of the work show that currently the use of AFCD for the project is favorable, and the completion of wells without flow control in these conditions is impractical.