{"title":"多项目粗切产能规划","authors":"R. D. Boer, J. M. Schutten","doi":"10.1615/faim1999.550","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":127745,"journal":{"name":"Proceeding of Flexible Automation and Integrated Manufacturing 1999","volume":"202 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"MULTI-PROJECT ROUGH-CUT CAPACITY PLANNING\",\"authors\":\"R. D. Boer, J. M. Schutten\",\"doi\":\"10.1615/faim1999.550\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":127745,\"journal\":{\"name\":\"Proceeding of Flexible Automation and Integrated Manufacturing 1999\",\"volume\":\"202 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceeding of Flexible Automation and Integrated Manufacturing 1999\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1615/faim1999.550\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceeding of Flexible Automation and Integrated Manufacturing 1999","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1615/faim1999.550","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}