{"title":"PERENCANAAN ULANG SALURAN DRAINASE BERWAWASAN LINGKUNGAN JALAN SEMPALWADAK – KREBET SENGGRONG KABUPATEN MALANG","authors":"chmad Hafiz Al Fath Hafiz, Agus Suhardono, M. Efendi","doi":"10.55404/jos-mrk.2021.02.03.249-255","DOIUrl":null,"url":null,"abstract":"Road drainage is needed to prevent inudation as on Sempalwadak – Krebet Senggrong road Malang Regency. The inundation occurs as a result of uneven drainage construction so that the road becomes damaged and can distrupt people’s activities. The existing purpose of this thesis is to design an environmentally drainage and drainage canal, evaluate the hydraulic aspects of the drainage and drainage buildings, calculate construction costs, and plan scheduling. The data needed are topographic maps, rainfall data from the 3 closest stations: Blambangan, Bululawang, and Tangkilsari in 2010 until 2019, and the price of the Malang Regency work principal in 2020. The data is processed using the Gumbel I method, suitability test with Chi-Square method, and Smirnov-Kolmogorov by a period of 10 years, rain intensity with the Mononobe method and design flood discharge with the Rationel method. The calculation result the design rainfall is 109.63 mm/day; design flood discharge of 3.0807 m/second; environmentaly drainage using infiltration wells with dimensions of 0.7 meters with a depth of 1.8 meters; channel dimensions of 1 m x 1.2 m; construction costs of Rp. 7,797,328,046.09; construction duration 90 days.","PeriodicalId":337938,"journal":{"name":"Jurnal JOS-MRK","volume":"71 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal JOS-MRK","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55404/jos-mrk.2021.02.03.249-255","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

道路排水系统需要防止洪水泛滥,就像玛琅县的森帕尔瓦达克-克雷贝特森荣公路一样。由于排水施工不均匀,导致道路被淹,影响人们的活动。本论文的现有目的是设计一条环境排水沟,评估排水沟和排水沟建筑物的水力方面,计算施工成本,并计划调度。所需的数据包括地图图、2010年至2019年3个最近站点(Blambangan、Bululawang和Tangkilsari)的降雨数据,以及2020年玛琅摄政工程的价格。数据处理采用Gumbel I法,适宜性检验采用卡方法,Smirnov-Kolmogorov法采用10年周期,降雨强度采用Mononobe法,设计洪流量采用Rationel法。计算结果设计降雨量为109.63 mm/d;设计洪流量3.0807 m/s;环境排水采用尺寸0.7米、深度1.8米的渗透井;通道尺寸为1米× 1.2米;建造费用7,797,328,046.09卢比;施工周期90天。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
PERENCANAAN ULANG SALURAN DRAINASE BERWAWASAN LINGKUNGAN JALAN SEMPALWADAK – KREBET SENGGRONG KABUPATEN MALANG
Road drainage is needed to prevent inudation as on Sempalwadak – Krebet Senggrong road Malang Regency. The inundation occurs as a result of uneven drainage construction so that the road becomes damaged and can distrupt people’s activities. The existing purpose of this thesis is to design an environmentally drainage and drainage canal, evaluate the hydraulic aspects of the drainage and drainage buildings, calculate construction costs, and plan scheduling. The data needed are topographic maps, rainfall data from the 3 closest stations: Blambangan, Bululawang, and Tangkilsari in 2010 until 2019, and the price of the Malang Regency work principal in 2020. The data is processed using the Gumbel I method, suitability test with Chi-Square method, and Smirnov-Kolmogorov by a period of 10 years, rain intensity with the Mononobe method and design flood discharge with the Rationel method. The calculation result the design rainfall is 109.63 mm/day; design flood discharge of 3.0807 m/second; environmentaly drainage using infiltration wells with dimensions of 0.7 meters with a depth of 1.8 meters; channel dimensions of 1 m x 1.2 m; construction costs of Rp. 7,797,328,046.09; construction duration 90 days.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
ANALISIS STABILITAS TUBUH BENDUNGAN PADA BENDUNGAN SEMANTOK KABUPATEN NGANJUK PROVINSI JAWA TIMUR ANALISA PERPANJANGAN LANDASAN PACU PADA BANDAR UDARA ABDULRACHMAN SALEH MALANG (STA 2+250 – STA 3+000) EVALUASI DAN PERENCANAAN ULANG SISTEM JARINGAN DRAINASE KECAMATAN KARTOHARJO KOTA MADIUN ANALISA KERUSAKAN JALAN MENGGUNAKAN METODE BINA MARGA PADA JALAN RAYA JERU – JALAN RAYA TUMPANG KABUPATEN MALANG PERENCANAAN ULANG STRUKTUR ATAS DAN RAB GEDUNG KULIAH AKN PUTRA SANG FAJAR
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1