区域电网黑启动柴油发电机组选型与仿真

Mosi Liu, Guangshi Liu, Zhiyuan Sun, S. Liang, Xiaoyin Qiu
{"title":"区域电网黑启动柴油发电机组选型与仿真","authors":"Mosi Liu, Guangshi Liu, Zhiyuan Sun, S. Liang, Xiaoyin Qiu","doi":"10.1109/CICED.2018.8592314","DOIUrl":null,"url":null,"abstract":"For micro-grids formed by multiple distributed sources of energy and the industrial park area grid, The selection of the black start power supply is a key factor in the rapid and reliable recovery of power supply after blackout. In this paper, the actual black start of regional power grid is taken as an example, two indicators were applied to the selection of a black start diesel generator set, and the MATLAB/SIMULINK simulation model is established, The adaptability of the selected diesel unit is verified, and the feasibility of using the emergency diesel generator as a black start power source in the thermal power plant is discussed.","PeriodicalId":142885,"journal":{"name":"2018 China International Conference on Electricity Distribution (CICED)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2018-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Selection and Simulation of Black-start Diesel Generating Set in Regional Power Grid\",\"authors\":\"Mosi Liu, Guangshi Liu, Zhiyuan Sun, S. Liang, Xiaoyin Qiu\",\"doi\":\"10.1109/CICED.2018.8592314\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"For micro-grids formed by multiple distributed sources of energy and the industrial park area grid, The selection of the black start power supply is a key factor in the rapid and reliable recovery of power supply after blackout. In this paper, the actual black start of regional power grid is taken as an example, two indicators were applied to the selection of a black start diesel generator set, and the MATLAB/SIMULINK simulation model is established, The adaptability of the selected diesel unit is verified, and the feasibility of using the emergency diesel generator as a black start power source in the thermal power plant is discussed.\",\"PeriodicalId\":142885,\"journal\":{\"name\":\"2018 China International Conference on Electricity Distribution (CICED)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 China International Conference on Electricity Distribution (CICED)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CICED.2018.8592314\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 China International Conference on Electricity Distribution (CICED)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CICED.2018.8592314","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

对于由多个分布式能源组成的微电网和工业园区电网,黑启动电源的选择是停电后快速可靠恢复供电的关键因素。本文以区域电网实际黑启动为例,将两项指标应用于黑启动柴油发电机组的选择,并建立了MATLAB/SIMULINK仿真模型,验证了所选柴油机组的适应性,探讨了应急柴油发电机组作为火电厂黑启动电源的可行性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Selection and Simulation of Black-start Diesel Generating Set in Regional Power Grid
For micro-grids formed by multiple distributed sources of energy and the industrial park area grid, The selection of the black start power supply is a key factor in the rapid and reliable recovery of power supply after blackout. In this paper, the actual black start of regional power grid is taken as an example, two indicators were applied to the selection of a black start diesel generator set, and the MATLAB/SIMULINK simulation model is established, The adaptability of the selected diesel unit is verified, and the feasibility of using the emergency diesel generator as a black start power source in the thermal power plant is discussed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A Deep Game Bidding Model and Practice of Electricity Market Research on Fault Location for UHV Half-wavelength Transmission Lines Comprehensive Evaluation of Insulation Performance of DC XLPE Cables Improvement of Distribution System Maintenance Plan Based on Risk Level The Application of Transient Calculation for Loop Closing of Distribution Network Based on The DSA
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1